EUVIMEDEUVIMED entdecken
Crossref

The right to collect stipulated penalty agreed in case of non-performance, after the contract had been terminated for non-performance

Nenad Grujic

Pravni zapisi · 2016

DOI: 10.5937/pravzap0-12459 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Pravni zapisi, 2016. Verfasst von Nenad Grujic.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Kein Abstract verfügbar.

Zitieren

APA

Grujic, N. (2016). The right to collect stipulated penalty agreed in case of non-performance, after the contract had been terminated for non-performance. Pravni zapisi. https://doi.org/10.5937/pravzap0-12459

Vancouver

Grujic N. The right to collect stipulated penalty agreed in case of non-performance, after the contract had been terminated for non-performance. Pravni zapisi. 2016. doi:10.5937/pravzap0-12459

BibTeX
@article{Grujic2016,
  author = {Grujic, Nenad},
  title = {The right to collect stipulated penalty agreed in case of non-performance, after the contract had been terminated for non-performance},
  journal = {Pravni zapisi},
  year = {2016},
  doi = {10.5937/pravzap0-12459}
}
Kostenlos starten →