Crossref
The implementation of modified pillar method in the excavation field 2 (OP-2) in the 'Osojno-jug' RL 'Lubnica' Mine
Podzemni radovi · 2015
DOI: 10.5937/podrad1527011d ↗Kurz gefasst
Fachartikel in der Zeitschrift Podzemni radovi, 2015. Verfasst von Milan Dubocanin.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
Dubocanin, M. (2015). The implementation of modified pillar method in the excavation field 2 (OP-2) in the 'Osojno-jug' RL 'Lubnica' Mine. Podzemni radovi. https://doi.org/10.5937/podrad1527011d
Vancouver
Dubocanin M. The implementation of modified pillar method in the excavation field 2 (OP-2) in the 'Osojno-jug' RL 'Lubnica' Mine. Podzemni radovi. 2015. doi:10.5937/podrad1527011d
BibTeX
@article{Dubocanin2015,
author = {Dubocanin, Milan},
title = {The implementation of modified pillar method in the excavation field 2 (OP-2) in the 'Osojno-jug' RL 'Lubnica' Mine},
journal = {Podzemni radovi},
year = {2015},
doi = {10.5937/podrad1527011d}
}
EUVIMED