EUVIMEDEUVIMED entdecken
Crossref

Stripping delay analysis in relation to designed long-term plan of excavation at the open pit Veliki Krivelj

Zoran Vaduveskovic, Mile Bugarin, Daniel Krzanovic

Mining and Metallurgy Engineering Bor · 2013

DOI: 10.5937/mmeb1302033v ↗

Kurz gefasst

Fachartikel in der Zeitschrift Mining and Metallurgy Engineering Bor, 2013. Verfasst von Zoran Vaduveskovic und 2 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Kein Abstract verfügbar.

Zitieren

APA

Vaduveskovic, Z., Bugarin, M., & Krzanovic, D. (2013). Stripping delay analysis in relation to designed long-term plan of excavation at the open pit Veliki Krivelj. Mining and Metallurgy Engineering Bor. https://doi.org/10.5937/mmeb1302033v

Vancouver

Vaduveskovic Z, Bugarin M, Krzanovic D. Stripping delay analysis in relation to designed long-term plan of excavation at the open pit Veliki Krivelj. Mining and Metallurgy Engineering Bor. 2013. doi:10.5937/mmeb1302033v

BibTeX
@article{Vaduveskovic2013,
  author = {Vaduveskovic, Zoran and Bugarin, Mile and Krzanovic, Daniel},
  title = {Stripping delay analysis in relation to designed long-term plan of excavation at the open pit Veliki Krivelj},
  journal = {Mining and Metallurgy Engineering Bor},
  year = {2013},
  doi = {10.5937/mmeb1302033v}
}
Kostenlos starten →