Kurz gefasst

Fachartikel in der Zeitschrift Journal of Applied Engineering Science, 2026. Verfasst von Hasimin Keçi und 1 weiteren Autor:innen. Die Arbeit nennt 14 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Supported by the Polytechnic University of Tirana for research on energy efficiency and alternative energy integration for cement-industry decarbonisation in A….

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Cement-sector decarbonisation must address both calcination and energy-related emissions, while carbon capture adds substantial heat and electricity demand. This study develops a transparent scenario assessment for a data-limited Albanian cement system. ANTEA Cement's published nameplate capacity of 1.4 million tonnes per year is used as a scale reference, and the submitted manuscript's assumed intensity of 0.49 t CO₂ per tonne of cement is retained as a modelling input, giving 686,000 t CO₂ per year. Because plant-level source data are unavailable, the baseline is allocated to calcination/process emissions (55%), fossil-fuel combustion (40%) and purchased electricity (5%). Measures are applied only to the relevant streams. In the integrated base case, clinker substitution, energy efficiency and alternative fuels reduce the direct streams before monoethanolamine post-combustion capture is applied at a 70% rate. Gross capture is 330,426 t CO₂ per year. After accounting for the capture-energy emissions, residual emissions are 255,098 t CO₂ per year, a 62.8% reduction from baseline. Combined lowand high-performance sensitivities yield reductions of 48.8% and 69.8%; neither case reaches net zero. At this scale, the base case would require conditioning and transport of approximately 0.33 Mt CO₂ per year, while no validated storage project or CO₂ transport chain is identified for Albania. Carbon-price calculations are exposure indicators, not estimates of actual CBAM liabilities. The results support a staged feasibility assessment, not investment or competitiveness conclusions.

Förderung

  • Supported by the Polytechnic University of Tirana for research on energy efficiency and alternative energy integration for cement-industry decarbonisation in A…

Zitieren

APA

Keçi, H., & Alcani, M. (2026). Integrated decarbonisation pathways for cement in Albania and the Western Balkans: An indicative carbon-cost and feasibility assessment under scale and infrastructure constraints. Journal of Applied Engineering Science, 24(4), 697-704. https://doi.org/10.5937/jaes0-66657

Vancouver

Keçi H, Alcani M. Integrated decarbonisation pathways for cement in Albania and the Western Balkans: An indicative carbon-cost and feasibility assessment under scale and infrastructure constraints. Journal of Applied Engineering Science. 2026;24(4):697-704. doi:10.5937/jaes0-66657

BibTeX
@article{Kei2026,
  author = {Keçi, Hasimin and Alcani, Majlinda},
  title = {Integrated decarbonisation pathways for cement in Albania and the Western Balkans: An indicative carbon-cost and feasibility assessment under scale and infrastructure constraints},
  journal = {Journal of Applied Engineering Science},
  year = {2026},
  volume = {24},
  number = {4},
  pages = {697--704},
  doi = {10.5937/jaes0-66657}
}
Kostenlos starten →