EUVIMEDEUVIMED entdecken
Open Access · CC BY-SA 4.0

Pareto analysis in bulldozer's failures and stoppages risk management

Vesna Spasojević-Brkić, Martina Perišić, Zorica Veljković, Mirjana Misita, Milanko Damjanović

Industrija · 2022 · 50 (2) · 37-49

DOI: 10.5937/industrija50-41907 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Industrija, 2022. Verfasst von Vesna Spasojević-Brkić und 4 weiteren Autor:innen. Die Arbeit wurde bisher 6-mal zitiert (Crossref) und nennt 15 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0). Gefördert von: Ministry of Education, Science and Technological Development of the Republic of Serbia.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Research related to risk management of failures and stoppages in the operation of bulldozer is very limited, so this topic needs more attention. This study aims to identify all possible causes for bulldozer failures and stoppages before highlighting the most significant ones. Descriptive statistics are provided, followed by a scatterplot for the dissipation diagram between hazard rate and bulldozer failure and stoppages, and histograms of hazard rate and failures and stoppages for bulldozers. Then, for three categories, a Pareto analysis was performed on failures and stoppages frequency, time spent in failures and stoppages, and failures and stoppages risk level. The Pareto analysis revealed that the most important failures and stoppages in all three categories were caused by heating repair, oil change, bulldozer cleaning, tonsil adjustment, filter replacement, hose replacement and screw replacement. The step towards "maintenance free factories" should include planning of identified activities in work breaks as preventive rather than corrective activities.

Förderung

  • Ministry of Education, Science and Technological Development of the Republic of Serbia

Zitieren

APA

Spasojević-Brkić, V., Perišić, M., Veljković, Z., Misita, M., & Damjanović, M. (2022). Pareto analysis in bulldozer's failures and stoppages risk management. Industrija, 50(2), 37-49. https://doi.org/10.5937/industrija50-41907

Vancouver

Spasojević-Brkić V, Perišić M, Veljković Z, Misita M, Damjanović M. Pareto analysis in bulldozer's failures and stoppages risk management. Industrija. 2022;50(2):37-49. doi:10.5937/industrija50-41907

BibTeX
@article{SpasojeviBrki2022,
  author = {Spasojević-Brkić, Vesna and Perišić, Martina and Veljković, Zorica and Misita, Mirjana and Damjanović, Milanko},
  title = {Pareto analysis in bulldozer's failures and stoppages risk management},
  journal = {Industrija},
  year = {2022},
  volume = {50},
  number = {2},
  pages = {37--49},
  doi = {10.5937/industrija50-41907}
}
Kostenlos starten →