Integrating RII, VSM, and EVM to Optimize Construction Performance of a Physiotherapy Facility in a Remote Mining Area
Equivalent: Jurnal Ilmiah Sosial Teknik · 04.11.2026 · 8 (5) · 2131-2143
DOI: 10.59261/jequi.v8i5.471 ↗Kurz gefasst
Fachartikel in der Zeitschrift Equivalent: Jurnal Ilmiah Sosial Teknik, online erschienen am 04.11.2026. Verfasst von Ifan Ariosandi und 2 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).
Abstract (Originalsprache)
Background
Construction projects in remote mining areas face schedule disruptions caused by complex approval procedures, logistical constraints, and changing project requirements. An integrated assessment is needed to identify the underlying causes of delays, their operational impacts, and their consequences for project performance.
Objective
This study aims to integrate the Relative Importance Index (RII), Value Stream Mapping (VSM), and Earned Value Management (EVM) to assess construction performance in a physiotherapy facility renovation project.
Methods
A single-case study was conducted using questionnaires completed by 30 respondents, interviews with 10 key informants, observations of 19 activities, project progress reports covering 34 weeks, and project documentation. RII was used to prioritize delay factors, VSM to identify operational waste, and EVM to evaluate schedule performance.
Results
The dominant delay factors were approval delays (RII = 0.947), logistical constraints (RII = 0.920), and scope changes (RII = 0.900). VSM identified 217 activity-days of cycle time and 292 activity-days of waiting time, yielding a total of 509 activity-days and a value-added ratio of 36.94%. The proposed future-state scenario indicated a potential reduction of 128 activity-days, although this estimate requires empirical verification. EVM yielded Schedule Performance Index (SPI) values of 0.773, 0.847, and 0.970 in Weeks 14, 27, and 34, respectively.
Conclusion
Integrating RII, VSM, and EVM provides a traceable framework for prioritizing delay factors, identifying process bottlenecks, and assessing schedule deviations. The proposed improvements require post-implementation validation before their effectiveness can be confirmed.
Zitieren
APA
Ariosandi, I., Setyandito, O., & Kasih, T. P. (2026). Integrating RII, VSM, and EVM to Optimize Construction Performance of a Physiotherapy Facility in a Remote Mining Area. Equivalent: Jurnal Ilmiah Sosial Teknik, 8(5), 2131-2143. https://doi.org/10.59261/jequi.v8i5.471
Vancouver
Ariosandi I, Setyandito O, Kasih TP. Integrating RII, VSM, and EVM to Optimize Construction Performance of a Physiotherapy Facility in a Remote Mining Area. Equivalent: Jurnal Ilmiah Sosial Teknik. 2026;8(5):2131-2143. doi:10.59261/jequi.v8i5.471
BibTeX
@article{Ariosandi2026,
author = {Ariosandi, Ifan and Setyandito, Oki and Kasih, Tota Pirdo},
title = {Integrating RII, VSM, and EVM to Optimize Construction Performance of a Physiotherapy Facility in a Remote Mining Area},
journal = {Equivalent: Jurnal Ilmiah Sosial Teknik},
year = {2026},
volume = {8},
number = {5},
pages = {2131--2143},
doi = {10.59261/jequi.v8i5.471}
}
EUVIMED