Selective Waiting-Time Reduction in Indonesian Fiberglass Shipbuilding: A Digital Lean Simulation Framework
Equivalent: Jurnal Ilmiah Sosial Teknik · 05.11.2026 · 8 (5) · 2196-2114
DOI: 10.59261/jequi.v8i5.470 ↗Kurz gefasst
Fachartikel in der Zeitschrift Equivalent: Jurnal Ilmiah Sosial Teknik, online erschienen am 05.11.2026. Verfasst von Jailani Jailani und 2 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).
Abstract (Originalsprache)
Background
Uniform waiting-time reduction in fiberglass shipbuilding may compromise essential technical processes, including curing, inspection, and safety checks. Therefore, waiting time must be classified according to its technical function and potential for reduction.
Objective
This study develops a simulation-based Digital Lean Manufacturing framework for selectively reducing waiting time in Indonesian engineer-to-order fiberglass shipbuilding.
Methods
A single-case study was conducted at PT Teluk Naga Bahari, Indonesia, covering eleven production stages. Value Stream Mapping (VSM) was integrated with deterministic discrete-event simulation using AnyLogic. Waiting time was classified into avoidable waiting (AW), reducible technical waiting (RTW), and fixed technical waiting (FTW). Five scenarios (S0–S4) were evaluated using waiting time, lead time, and Process Cycle Efficiency (PCE).
Results
The baseline recorded a cycle time of 157 days, waiting time of 67 days, lead time of 224 days, and PCE of 70.09%. Waiting time comprised 15 days of AW (22.39%), 24 days of RTW (35.82%), and 28 days of FTW (41.79%). Scenario S4 achieved the greatest simulated improvement, reducing waiting time to 44 days and lead time to 189 days while increasing PCE to 76.72%. Lead time decreased by 15.63%, while FTW was preserved.
Conclusion
Selective waiting-time classification enables targeted efficiency improvements while preserving essential technical constraints. However, simulated reductions in RTW require material and process validation before implementation. The framework provides a transferable decision-making approach for fiberglass shipyards.
Zitieren
APA
Jailani, J., Gunawan, Y., & Sudjaniah, D. (2026). Selective Waiting-Time Reduction in Indonesian Fiberglass Shipbuilding: A Digital Lean Simulation Framework. Equivalent: Jurnal Ilmiah Sosial Teknik, 8(5), 2196-2114. https://doi.org/10.59261/jequi.v8i5.470
Vancouver
Jailani J, Gunawan Y, Sudjaniah D. Selective Waiting-Time Reduction in Indonesian Fiberglass Shipbuilding: A Digital Lean Simulation Framework. Equivalent: Jurnal Ilmiah Sosial Teknik. 2026;8(5):2196-2114. doi:10.59261/jequi.v8i5.470
BibTeX
@article{Jailani2026,
author = {Jailani, Jailani and Gunawan, Yustiar and Sudjaniah, Derah},
title = {Selective Waiting-Time Reduction in Indonesian Fiberglass Shipbuilding: A Digital Lean Simulation Framework},
journal = {Equivalent: Jurnal Ilmiah Sosial Teknik},
year = {2026},
volume = {8},
number = {5},
pages = {2196--2114},
doi = {10.59261/jequi.v8i5.470}
}
EUVIMED