Contractor Mobilization Process Improvement Using the DMAIC Framework in a Large-Scale Mining Company in Indonesia

Whina Anugraheni Maharani, Liane Okdinawati

Journal of Business, Social and Technology · 15.08.2026 · 7 (3) · 1196-1212

DOI: 10.59261/jbt.v7i3.724 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Journal of Business, Social and Technology, online erschienen am 15.08.2026. Verfasst von Whina Anugraheni Maharani und 1 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Background

Contractor mobilization plays a critical role in ensuring workforce readiness and supporting the timely execution of large-scale industrial projects. However, complex administrative requirements, extensive compliance procedures, and coordination among multiple stakeholders often create inefficiencies that affect project performance.

Objective

This study analyzes and improves the contractor mobilization process within one of divisions of a large-scale mining company in Indonesia during a major overhaul project. Although the project was planned for 35 calendar days, actual completion required 84 days, indicating substantial deviation from the planned project schedule.

Methods

The study employs the Define–Measure–Analyze–Improve–Control (DMAIC) framework using qualitative and quantitative data obtained from interviews, document reviews, and internal performance records. Process performance was assessed using four indicators Mobilization Lead Time (MLT), Mobilization Fulfillment Ratio (MFR), Readiness Compliance (RC), and Delay Frequency (DF), all of which were defined at first use in the text.

Results

The findings reveal an average Mobilization Lead Time (MLT) of 57 days, exceeding the 30-working-day service-level target. The overall Mobilization Fulfillment Ratio (MFR) was 82.1% (270 of 329 planned contractors mobilized); however, only 48.6% of contractors were available at project commencement (initial fulfillment rate), while Readiness Compliance (RC) was 27.8% and Delay Frequency (DF) was 40.7%.

Conclusion

These improvements are expected to reduce mobilization lead time, enhance workforce readiness, strengthen cross-functional coordination, and improve the overall effectiveness of contractor mobilization management.

Zitieren

APA

Maharani, W. A., & Okdinawati, L. (2026). Contractor Mobilization Process Improvement Using the DMAIC Framework in a Large-Scale Mining Company in Indonesia. Journal of Business, Social and Technology, 7(3), 1196-1212. https://doi.org/10.59261/jbt.v7i3.724

Vancouver

Maharani WA, Okdinawati L. Contractor Mobilization Process Improvement Using the DMAIC Framework in a Large-Scale Mining Company in Indonesia. Journal of Business, Social and Technology. 2026;7(3):1196-1212. doi:10.59261/jbt.v7i3.724

BibTeX
@article{Maharani2026,
  author = {Maharani, Whina Anugraheni and Okdinawati, Liane},
  title = {Contractor Mobilization Process Improvement Using the DMAIC Framework in a Large-Scale Mining Company in Indonesia},
  journal = {Journal of Business, Social and Technology},
  year = {2026},
  volume = {7},
  number = {3},
  pages = {1196--1212},
  doi = {10.59261/jbt.v7i3.724}
}
Kostenlos starten →