A Transparent BESS Sizing Framework for Ramp-Rate Control of a 100 MW Solar PV Plant Using SoDa Synthetic Power Profiles

Muhammad Haikal Erniza Putra, Faiz Husnayain

Journal of Business, Social and Technology · 20.08.2026 · 7 (3) · 1270-1282

DOI: 10.59261/jbt.v7i3.717 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Journal of Business, Social and Technology, online erschienen am 20.08.2026. Verfasst von Muhammad Haikal Erniza Putra und 1 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Background

The integration of utility-scale solar photovoltaic power plants requires attention to short-term power fluctuations because photovoltaic output can change rapidly due to variations in irradiance, temperature, atmospheric conditions, and cloud movement.

Objective

This study aims to evaluate a SoDa-based synthetic photovoltaic power profile and optimize Battery Energy Storage System capacity for ramp-rate control of a 100 MW solar photovoltaic power plant.

Methods

A quantitative simulation and optimization approach was applied. A one-minute synthetic photovoltaic power profile was generated using SoDa, evaluated for monthly consistency against NASA POWER, and analyzed under multiple ramp-rate limit scenarios. The optimum BESS power and energy capacities were determined using deterministic grid search and benchmarked against Particle Swarm Optimization (PSO).

Results

The synthetic profile demonstrated adequate monthly consistency with NASA POWER (Pearson r = 0.860, rRMSE = 5.99%), confirming its suitability for pre-feasibility ramp-rate analysis. Stricter ramp-rate limits produced markedly more violations and required higher BESS capacities, ranging from 10 MW/10 MWh for moderate limits up to 20.5 MW/20.5 MWh for the most stringent scenario, with 100% compliance achieved in all cases. This framework demonstrates the practical value of synthetic data-driven BESS sizing for early-stage solar project planning in data-scarce environments.

Conclusion

Stricter ramp-rate limits increase BESS capacity requirements once the minimum capacity constraint is no longer sufficient. This study contributes an auditable, transparent pre-feasibility framework that integrates synthetic data generation, and advancing the literature on data-driven energy storage sizing for utility-scale solar PV projects.

Zitieren

APA

Putra, M. H. E., & Husnayain, F. (2026). A Transparent BESS Sizing Framework for Ramp-Rate Control of a 100 MW Solar PV Plant Using SoDa Synthetic Power Profiles. Journal of Business, Social and Technology, 7(3), 1270-1282. https://doi.org/10.59261/jbt.v7i3.717

Vancouver

Putra MHE, Husnayain F. A Transparent BESS Sizing Framework for Ramp-Rate Control of a 100 MW Solar PV Plant Using SoDa Synthetic Power Profiles. Journal of Business, Social and Technology. 2026;7(3):1270-1282. doi:10.59261/jbt.v7i3.717

BibTeX
@article{Putra2026,
  author = {Putra, Muhammad Haikal Erniza and Husnayain, Faiz},
  title = {A Transparent BESS Sizing Framework for Ramp-Rate Control of a 100 MW Solar PV Plant Using SoDa Synthetic Power Profiles},
  journal = {Journal of Business, Social and Technology},
  year = {2026},
  volume = {7},
  number = {3},
  pages = {1270--1282},
  doi = {10.59261/jbt.v7i3.717}
}
Kostenlos starten →