Perancangan Sistem Kanban dan 5S sebagai Upaya Pengurangan Waste Overproduction dan Waste Inventory pada UKM Logam
JURNAL ILMIAH TEKNIK INDUSTRI DAN INOVASI · 31.07.2026 · 4 (3) · 386-302
DOI: 10.59024/jisi.v4i3.2403 ↗Kurz gefasst
Fachartikel in der Zeitschrift JURNAL ILMIAH TEKNIK INDUSTRI DAN INOVASI, online erschienen am 31.07.2026. Verfasst von Fahmi Syarifudin Ahmad und 1 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).
Abstract (Originalsprache)
This study addresses a metal-component SME producing motorcycle rear brake pedals and rings, which faces two primary Waste problems: overproduction Waste resulting in Work-in-process (WIP) accumulation of 31,860 units/day across 16 workstations, and inventory Waste caused by a finished-goods warehouse lacking a storage layout system, storage racks, or clear visual markers. This research aims to design a kanban system and propose 5S improvements as an integrated solution to address both problems. The method used is a quantitative descriptive approach with a case study using February 2026 production data. The kanban system design results show that each workstation requires 3 production kanban cards (P-Kanban) and 3 withdrawal kanban cards (W-Kanban), with container capacities varying across processes. Implementation of the kanban system was able to reduce average WIP by 70% from the initial condition. Meanwhile, the 5S checklist assessment results show an average achievement of 46.7%, with the Seiton, Seiketsu, and Shitsuke phases identified as improvement priorities, each achieving 33.3%. The proposed 5S improvements include the procurement of tiered storage racks with a color-coding system, product zoning, preparation of storage SOPs, and periodic internal audits.
Zitieren
APA
Ahmad, F. S., & Mukhtar, M. N. A. (2026). Perancangan Sistem Kanban dan 5S sebagai Upaya Pengurangan Waste Overproduction dan Waste Inventory pada UKM Logam. JURNAL ILMIAH TEKNIK INDUSTRI DAN INOVASI, 4(3), 386-302. https://doi.org/10.59024/jisi.v4i3.2403
Vancouver
Ahmad FS, Mukhtar MNA. Perancangan Sistem Kanban dan 5S sebagai Upaya Pengurangan Waste Overproduction dan Waste Inventory pada UKM Logam. JURNAL ILMIAH TEKNIK INDUSTRI DAN INOVASI. 2026;4(3):386-302. doi:10.59024/jisi.v4i3.2403
BibTeX
@article{Ahmad2026,
author = {Ahmad, Fahmi Syarifudin and Mukhtar, M. Nushron Ali},
title = {Perancangan Sistem Kanban dan 5S sebagai Upaya Pengurangan Waste Overproduction dan Waste Inventory pada UKM Logam},
journal = {JURNAL ILMIAH TEKNIK INDUSTRI DAN INOVASI},
year = {2026},
volume = {4},
number = {3},
pages = {386--302},
doi = {10.59024/jisi.v4i3.2403}
}
EUVIMED