EUVIMEDEUVIMED entdecken
Open Access · CC BY-SA 4.0

Analisis Waste pada Produksi Arm Sepeda Motor Menggunakan Metode 5S dan Value Stream Mapping di PT XYZ

Mochammad Tomy Santoso, M. Nushron Ali Mukhtar

JURNAL ILMIAH TEKNIK INDUSTRI DAN INOVASI · 24.07.2026 · 4 (3) · 299-317

DOI: 10.59024/jisi.v4i3.2269 ↗

Kurz gefasst

Fachartikel in der Zeitschrift JURNAL ILMIAH TEKNIK INDUSTRI DAN INOVASI, online erschienen am 24.07.2026. Verfasst von Mochammad Tomy Santoso und 1 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The development of the manufacturing industry at the Small and Medium Enterprises (SMEs) scale in Indonesia demands increased efficiency in the production process to be competitive, but various wastes are still found, especially in non-value-added activities. This study aims to identify, analyze, and minimize waste in the production process of motorcycle Arm spare parts at PT. XYZ. The method used is a Lean Manufacturing approach through the application of Value Stream Mapping (VSM) and 5S (Seiri, Seiton, Seiso, Seiketsu, Shitsuke). Data collection was carried out through direct observation, interviews, and questionnaires to identify the dominant types of waste using VALSAT (Value Stream Analysis Tools) weighting. The results showed that the main waste that occurred was movement and transportation caused by manual cleaning processes, suboptimal layouts, and inefficient material flow. Current State Mapping analysis showed a total waiting time of 4322 seconds, with activities that still contain waste. After the proposed improvements through Future State Mapping and the implementation of 5S, there was an increase in efficiency with a waiting time of 4260 seconds and an improvement in the condition of the work area to be neater, more organized, and safer. The conclusion of this study shows that the integration of VSM and 5S methods is effective in reducing waste, improving process flow, and increasing productivity and work efficiency in the metal SME industry.

Zitieren

APA

Santoso, M. T., & Mukhtar, M. N. A. (2026). Analisis Waste pada Produksi Arm Sepeda Motor Menggunakan Metode 5S dan Value Stream Mapping di PT XYZ. JURNAL ILMIAH TEKNIK INDUSTRI DAN INOVASI, 4(3), 299-317. https://doi.org/10.59024/jisi.v4i3.2269

Vancouver

Santoso MT, Mukhtar MNA. Analisis Waste pada Produksi Arm Sepeda Motor Menggunakan Metode 5S dan Value Stream Mapping di PT XYZ. JURNAL ILMIAH TEKNIK INDUSTRI DAN INOVASI. 2026;4(3):299-317. doi:10.59024/jisi.v4i3.2269

BibTeX
@article{Santoso2026,
  author = {Santoso, Mochammad Tomy and Mukhtar, M. Nushron Ali},
  title = {Analisis Waste pada Produksi Arm Sepeda Motor Menggunakan Metode 5S dan Value Stream Mapping di PT XYZ},
  journal = {JURNAL ILMIAH TEKNIK INDUSTRI DAN INOVASI},
  year = {2026},
  volume = {4},
  number = {3},
  pages = {299--317},
  doi = {10.59024/jisi.v4i3.2269}
}
Kostenlos starten →