PENERAPAN MANAJEMEN RISIKO DI UNIT KERJA RMIK
JRMIK · 2023
DOI: 10.58535/jrmik.v4i1.49 ↗Kurz gefasst
Fachartikel in der Zeitschrift JRMIK, 2023. Verfasst von Zefan Adiputra Golo und 3 weiteren Autor:innen. Die Arbeit wurde bisher 1-mal zitiert (Crossref). Der Volltext ist frei zugänglich (Open Access, CC BY-NC-SA 4.0).
Abstract (Originalsprache)
Background
TPPRJ as a leading unit that provides services to patients needs to minimize the risks and hazard that can be experienced by officers and patients. From a preliminary study at one of the local government hospitals in the Central Java region, it was found that at the outpatient registration point there was no Standar Procedur Operational (SPO) regarding risk management, so there was no standard set for risk control for officers and patients.
Objective
The purpose of this study is to identify the application of risk management in the outpatient registration site (TPPRJ) of the hospital.
Method
The type of research used in this study is qualitative descriptive with a case study design. The subjects of the study were 4 informants determined by purposive sampling techniques. Data collection through interviews and observationsResults: There are several risk factors in TPPRJ, namely from physical aspects (air temperature, lighting, radiation), biological aspects and ergonomic aspects. From the results of interviews and observations, it is known that the implementation of risk management in hospitals has been running, but it is still not optimal because it has not yet reached a comprehensive evaluation from the hospital's quality management.
Conclusion
Risk management has been running but has not been maximized, because there is no SPO that specifically regulates risk management at TPPRJ. The risk management process that has been running is to identify risks, risk analysis and risk control.Keywords: Risk Management, RMIK Work Unit, TPPRJ
Zitieren
APA
Golo, Z. A., Ilyas, A. A., Fadhilah, I. Q., & Sugiharto, S. (2023). PENERAPAN MANAJEMEN RISIKO DI UNIT KERJA RMIK. JRMIK. https://doi.org/10.58535/jrmik.v4i1.49
Vancouver
Golo ZA, Ilyas AA, Fadhilah IQ, Sugiharto S. PENERAPAN MANAJEMEN RISIKO DI UNIT KERJA RMIK. JRMIK. 2023. doi:10.58535/jrmik.v4i1.49
BibTeX
@article{Golo2023,
author = {Golo, Zefan Adiputra and Ilyas, Arief Azhari and Fadhilah, Isnaini Qoriatul and Sugiharto, Sugiharto},
title = {PENERAPAN MANAJEMEN RISIKO DI UNIT KERJA RMIK},
journal = {JRMIK},
year = {2023},
doi = {10.58535/jrmik.v4i1.49}
}
EUVIMED