EUVIMEDEUVIMED entdecken
Crossref

Evaluasi Overhaul terhadap Efisiensi Boiler Unit 3 PLTU Lontar

Eri Prabowo, Trassanda Scudetto Widestomo Putra, Ajibrila Nabawi

JTM : JURNAL TEKNIK MESIN · 01.08.2026 · 2 (2) · 181-189

DOI: 10.58466/vrfmq234 ↗

Kurz gefasst

Fachartikel in der Zeitschrift JTM : JURNAL TEKNIK MESIN, online erschienen am 01.08.2026. Verfasst von Eri Prabowo und 2 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The boiler is the main component of a steam power plant because it converts feedwater into high-temperature and high-pressure steam for turbine operation. Boiler efficiency is affected by combustion quality, coal characteristics, air supply, heat-transfer cleanliness, and the condition of auxiliary equipment. This study evaluates the effect of overhaul on the efficiency of Boiler Unit 3 at UJP PLTU Banten 3 Lontar. The calculation uses performance-test data before and after overhaul at a 294 MW load. Two methods are applied: the direct or input-output method and the indirect or heat-loss method based on ASME PTC 4. The direct-method efficiency increased from 79.51% before overhaul to 79.68% after overhaul, equivalent to a 0.17 percentage-point improvement. The indirect-method efficiency increased from 81.85% to 82.61%, equivalent to a 0.76 percentage-point improvement. The reduction in dry flue-gas loss, hydrogen-moisture loss, coal-moisture loss, and air-moisture loss indicates that overhaul improves boiler heat utilization, especially through tube cleaning, air-preheater cleaning, and restoration of combustion-supporting equipment. The results confirm that scheduled overhaul can improve boiler performance and should be maintained as part of plant reliability management

Zitieren

APA

Prabowo, E., Putra, T. S. W., & Nabawi, A. (2026). Evaluasi Overhaul terhadap Efisiensi Boiler Unit 3 PLTU Lontar. JTM : JURNAL TEKNIK MESIN, 2(2), 181-189. https://doi.org/10.58466/vrfmq234

Vancouver

Prabowo E, Putra TSW, Nabawi A. Evaluasi Overhaul terhadap Efisiensi Boiler Unit 3 PLTU Lontar. JTM : JURNAL TEKNIK MESIN. 2026;2(2):181-189. doi:10.58466/vrfmq234

BibTeX
@article{Prabowo2026,
  author = {Prabowo, Eri and Putra, Trassanda Scudetto Widestomo and Nabawi, Ajibrila},
  title = {Evaluasi Overhaul terhadap Efisiensi Boiler Unit 3 PLTU Lontar},
  journal = {JTM : JURNAL TEKNIK MESIN},
  year = {2026},
  volume = {2},
  number = {2},
  pages = {181--189},
  doi = {10.58466/vrfmq234}
}
Kostenlos starten →