EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

The Confounding Effect of Value Management on the Relationship between Public-Private Partnerships and Sustainable Performance of Road Agencies in Kenya

Akoth Matildah Ajwang, Albert Washinton Ochung Tambo, Mengich Esau Mneria

Journal of Procurement and Supply Chain Management · 22.07.2026 · 5 (4) · 81-105

DOI: 10.58425/jpscm.v5i4.587 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Journal of Procurement and Supply Chain Management, online erschienen am 22.07.2026. Verfasst von Akoth Matildah Ajwang und 2 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Aim

This study examines the confounding effect of Value Management (VM) on the relationship between Public-Private Partnership (PPP) elements and sustainable performance.

Methods

A quantitative research design was employed, utilizing survey data from 210 road agency professionals involved in PPP projects in Kenya. Hierarchical regression analysis was conducted, with Model 1 comprising four PPP elements (contract agreement, project financing, risk allocation, and stakeholder management) and Model 2 introducing functional analysis and cost analysis as VM control variables.

Results

Model 1 explained 45.4% of the variance in sustainable performance (R² = .454, F(4, 205) = 42.62, p < .001). The introduction of VM elements significantly improved the model, accounting for 52.5% of the variance (R² = .525, ΔR² = .071, ΔF(2, 203) = 15.17, p < .001). Differential confounding effects were observed: contract agreement (β = .299 to .260) and project financing (β = .180 to .150) were attenuated, while risk allocation (β = .184 to .223) and stakeholder management (β = .298 to .301) were enhanced. Both functional analysis (β = .216, p = .001) and cost analysis (β = .186, p = .005) emerged as significant independent predictors.

Conclusion

VM exerts a significant confounding effect on the PPP-sustainable performance relationship, operating through multiple mechanisms: as a value translation mechanism, risk enabler, and stakeholder enabler. VM fundamentally alters how different PPP elements predict sustainability outcomes. Recommendation: Policymakers and project managers should integrate VM principles, particularly functional and cost analysis, as essential components of PPP project planning and execution rather than supplementary activities. Future research should employ structural equation modeling to examine mediating pathways and test generalizability across different contexts.

Zitieren

APA

Ajwang, A. M., Tambo, A. W. O., & Mneria, M. E. (2026). The Confounding Effect of Value Management on the Relationship between Public-Private Partnerships and Sustainable Performance of Road Agencies in Kenya. Journal of Procurement and Supply Chain Management, 5(4), 81-105. https://doi.org/10.58425/jpscm.v5i4.587

Vancouver

Ajwang AM, Tambo AWO, Mneria ME. The Confounding Effect of Value Management on the Relationship between Public-Private Partnerships and Sustainable Performance of Road Agencies in Kenya. Journal of Procurement and Supply Chain Management. 2026;5(4):81-105. doi:10.58425/jpscm.v5i4.587

BibTeX
@article{Ajwang2026,
  author = {Ajwang, Akoth Matildah and Tambo, Albert Washinton Ochung and Mneria, Mengich Esau},
  title = {The Confounding Effect of Value Management on the Relationship between Public-Private Partnerships and Sustainable Performance of Road Agencies in Kenya},
  journal = {Journal of Procurement and Supply Chain Management},
  year = {2026},
  volume = {5},
  number = {4},
  pages = {81--105},
  doi = {10.58425/jpscm.v5i4.587}
}
Kostenlos starten →