Risk Analysis of the Supply Chain of Building Project Construction Materials (Hasna Medika Majalengka Heart Clinic)
Journal of World Science · 18.06.2026 · 5 (6) · 547-558
DOI: 10.58344/jws.v5i6.1673 ↗Kurz gefasst
Fachartikel in der Zeitschrift Journal of World Science, online erschienen am 18.06.2026. Verfasst von Dwi Nah Vasa und 3 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).
Abstract (Originalsprache)
This research aims to analyze risks in the construction material supply chain to ensure the efficiency and success of the project. The study focuses on the strategic project for the construction of the Hasna Medika Heart Clinic Building in Majalengka, where the dependence on material availability and supply chain complexity makes risk management crucial to prevent delays and cost overruns. The research methods used are a mixture of qualitative and quantitative, including field observations, interviews, and preliminary and main surveys to seven and ten expert respondents from contractors and suppliers. Data are analyzed to identify and assess the frequency of risk emergence. The results of the study identified 18 risk variables. The analysis shows differences in antara_kontraktor_dan_supplier perceptions of the most sering_terjadi risiko_yang. The contractor noted the main risk on the change of order (A2, 27.78%), additional requests from the owner (A5, 25.93%), and increases in material prices (A16, 27.78%). Meanwhile, suppliers are more concerned about inaccurate schedules from contractors (A1, 25.93%) and delivery delays due to payment problems (A9, 25.93%). However, both sides reached consensus on two of the most critical risks that are equally frequent, namely ineffective communication (A12) and rising material prices (A16). In conclusion, effective communication and price fluctuation management are the key priorities for mitigating supply chain risks in construction projects, and contractors and suppliers should establish transparent coordination mechanisms and adaptive budget planning to prevent delays and cost overruns.
Zitieren
APA
Vasa, D. N., Jannah, N. A., Nugraha, B., & Marantica, L. (2026). Risk Analysis of the Supply Chain of Building Project Construction Materials (Hasna Medika Majalengka Heart Clinic). Journal of World Science, 5(6), 547-558. https://doi.org/10.58344/jws.v5i6.1673
Vancouver
Vasa DN, Jannah NA, Nugraha B, Marantica L. Risk Analysis of the Supply Chain of Building Project Construction Materials (Hasna Medika Majalengka Heart Clinic). Journal of World Science. 2026;5(6):547-558. doi:10.58344/jws.v5i6.1673
BibTeX
@article{Vasa2026,
author = {Vasa, Dwi Nah and Jannah, Nada Azharul and Nugraha, Bayu and Marantica, Lutfi},
title = {Risk Analysis of the Supply Chain of Building Project Construction Materials (Hasna Medika Majalengka Heart Clinic)},
journal = {Journal of World Science},
year = {2026},
volume = {5},
number = {6},
pages = {547--558},
doi = {10.58344/jws.v5i6.1673}
}
EUVIMED