EUVIMEDEUVIMED entdecken
Crossref

Thermal and Economic Assessment of Cooling Technologies in a Combined Cycle Power Plant: A Case Study Bandar Abbas Hengam Power Plant

M. Jalali, M. Mohammadi, H. Heidary

International Journal of Engineering · 2027 · 40 (2) · 347-360

DOI: 10.5829/ije.2027.40.02b.02 ↗

Kurz gefasst

Fachartikel in der Zeitschrift International Journal of Engineering, 2027. Verfasst von M. Jalali und 2 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Kein Abstract verfügbar.

Zitieren

APA

Jalali, M., Mohammadi, M., & Heidary, H. (2027). Thermal and Economic Assessment of Cooling Technologies in a Combined Cycle Power Plant: A Case Study Bandar Abbas Hengam Power Plant. International Journal of Engineering, 40(2), 347-360. https://doi.org/10.5829/ije.2027.40.02b.02

Vancouver

Jalali M, Mohammadi M, Heidary H. Thermal and Economic Assessment of Cooling Technologies in a Combined Cycle Power Plant: A Case Study Bandar Abbas Hengam Power Plant. International Journal of Engineering. 2027;40(2):347-360. doi:10.5829/ije.2027.40.02b.02

BibTeX
@article{Jalali2027,
  author = {Jalali, M. and Mohammadi, M. and Heidary, H.},
  title = {Thermal and Economic Assessment of Cooling Technologies in a Combined Cycle Power Plant: A Case Study Bandar Abbas Hengam Power Plant},
  journal = {International Journal of Engineering},
  year = {2027},
  volume = {40},
  number = {2},
  pages = {347--360},
  doi = {10.5829/ije.2027.40.02b.02}
}
Kostenlos starten →