Towards a Lean-Oriented Multi-Mode Resource-Constrained Project Scheduling Problem with Activity Crashing and Preemption: A Real-Case Study
International Journal of Engineering · 2027 · 40 (1) · 316-337
DOI: 10.5829/ije.2027.40.01a.22 ↗Kurz gefasst
Fachartikel in der Zeitschrift International Journal of Engineering, 2027. Verfasst von M. Ahmadi und 2 weiteren Autor:innen.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
Ahmadi, M., Tavakkoli-Moghaddam, R., & Bozorgi-Amiri, A. (2027). Towards a Lean-Oriented Multi-Mode Resource-Constrained Project Scheduling Problem with Activity Crashing and Preemption: A Real-Case Study. International Journal of Engineering, 40(1), 316-337. https://doi.org/10.5829/ije.2027.40.01a.22
Vancouver
Ahmadi M, Tavakkoli-Moghaddam R, Bozorgi-Amiri A. Towards a Lean-Oriented Multi-Mode Resource-Constrained Project Scheduling Problem with Activity Crashing and Preemption: A Real-Case Study. International Journal of Engineering. 2027;40(1):316-337. doi:10.5829/ije.2027.40.01a.22
BibTeX
@article{Ahmadi2027,
author = {Ahmadi, M. and Tavakkoli-Moghaddam, R. and Bozorgi-Amiri, A.},
title = {Towards a Lean-Oriented Multi-Mode Resource-Constrained Project Scheduling Problem with Activity Crashing and Preemption: A Real-Case Study},
journal = {International Journal of Engineering},
year = {2027},
volume = {40},
number = {1},
pages = {316--337},
doi = {10.5829/ije.2027.40.01a.22}
}