Optimalisasi Waktu dan Biaya melalui Value Engineering Substitusi Standar Material Baja pada Proyek EPC

Alde Noverli. Y, Rachmi Yanita

Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim · 30.06.2026 · 5 (2) · 312-321

DOI: 10.58192/ocean.v5i2.5296 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim, online erschienen am 30.06.2026. Verfasst von Alde Noverli. Y und 1 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The implementation of Engineering, Procurement, and Construction (EPC) projects often encounters logistical and supply chain challenges, particularly when design specifications strictly adhere to foreign standards not locally available. This research evaluates the application of Value Engineering (VE) to resolve material scarcity in an integrated Central Processing Facility project in East Kalimantan. The initial design mandated Chinese standard (GB) materials, causing an 8-12 week import lead time that threatened the critical path of the lump-sum contract. Through a Technical Deviation Request (TDR), the engineering team proposed substituting GB materials with equivalent Indonesian National Standards (SNI) and ASTM materials. A multi-criteria decision analysis was utilized to ensure the structural integrity, verifying the geometric validation and mechanical capacities of local H-Beams and high-strength rebars. The results demonstrate a significant project acceleration of 30 days and a direct cost efficiency of 13% (Rp 1.625 billion). The substitution also reinforced local industry empowerment (TKDN) and minimized the carbon footprint of international logistics, all while strictly adhering to occupational health and safety (HSE) protocols.

Zitieren

APA

Y, A. N., & Yanita, R. (2026). Optimalisasi Waktu dan Biaya melalui Value Engineering Substitusi Standar Material Baja pada Proyek EPC. Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim, 5(2), 312-321. https://doi.org/10.58192/ocean.v5i2.5296

Vancouver

Y AN, Yanita R. Optimalisasi Waktu dan Biaya melalui Value Engineering Substitusi Standar Material Baja pada Proyek EPC. Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim. 2026;5(2):312-321. doi:10.58192/ocean.v5i2.5296

BibTeX
@article{Y2026,
  author = {Y, Alde Noverli. and Yanita, Rachmi},
  title = {Optimalisasi Waktu dan Biaya melalui Value Engineering Substitusi Standar Material Baja pada Proyek EPC},
  journal = {Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim},
  year = {2026},
  volume = {5},
  number = {2},
  pages = {312--321},
  doi = {10.58192/ocean.v5i2.5296}
}
Kostenlos starten →