STRATEGIC RISK IDENTIFICATION AND QUANTIFICATION TECHNIQUES AND PROJECT ABANDONMENT: EVIDENCE FROM CONSTRUCTION FIRMS IN LAGOS STATE, NIGERIA
International Journal of Accounting, Management and Economic Review · 30.04.2026 · 2 (1) · 496-515
DOI: 10.57233/ijamer.v2i1.30 ↗Kurz gefasst
Fachartikel in der Zeitschrift International Journal of Accounting, Management and Economic Review, online erschienen am 30.04.2026. Verfasst von Olateju O. I. und 1 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).
Abstract (Originalsprache)
Project abandonment remains a persistent challenge in the construction sector, particularly in Lagos State, Nigeria, where financial volatility, regulatory uncertainty, and managerial inefficiencies heighten project risks. This study examined the effect of strategic risk identification and quantification techniques on project abandonment among selected construction firms in Lagos State. A cross-sectional survey research design was adopted, and data were collected from 177 respondents across 37 registered building construction companies. Data were analyzed using descriptive statistics and simple linear regression analysis. The findings revealed that strategic risk identification techniques have a statistically significant effect on project abandonment (R² = 0.194, β = 0.442, t = 6.499, p < 0.001), while risk quantification techniques also significantly influence project abandonment (R² = 0.198, β = 0.250, t = 6.571, p < 0.001). The results indicate that both techniques explain a moderate proportion of variation in project abandonment. However, contrary to a priori expectations, the positive coefficients suggest that higher reported adoption of risk identification and quantification techniques is associated with higher levels of project abandonment. This may reflect endogeneity effects, post-failure risk documentation, or same-source bias inherent in cross-sectional survey designs. The study concludes that while structured risk management practices are statistically significant predictors of project abandonment, their effectiveness may depend on the timing, depth, and strategic integration of these practices. It recommends strengthening proactive risk assessment frameworks, improving financial modelling capabilities, and enhancing managerial competence to ensure sustainable project delivery in Lagos State
Zitieren
APA
I., O. O., & I., O. I. (2026). STRATEGIC RISK IDENTIFICATION AND QUANTIFICATION TECHNIQUES AND PROJECT ABANDONMENT: EVIDENCE FROM CONSTRUCTION FIRMS IN LAGOS STATE, NIGERIA. International Journal of Accounting, Management and Economic Review, 2(1), 496-515. https://doi.org/10.57233/ijamer.v2i1.30
Vancouver
I. OO, I. OI. STRATEGIC RISK IDENTIFICATION AND QUANTIFICATION TECHNIQUES AND PROJECT ABANDONMENT: EVIDENCE FROM CONSTRUCTION FIRMS IN LAGOS STATE, NIGERIA. International Journal of Accounting, Management and Economic Review. 2026;2(1):496-515. doi:10.57233/ijamer.v2i1.30
BibTeX
@article{I2026,
author = {I., Olateju O. and I., Oshin I.},
title = {STRATEGIC RISK IDENTIFICATION AND QUANTIFICATION TECHNIQUES AND PROJECT ABANDONMENT: EVIDENCE FROM CONSTRUCTION FIRMS IN LAGOS STATE, NIGERIA},
journal = {International Journal of Accounting, Management and Economic Review},
year = {2026},
volume = {2},
number = {1},
pages = {496--515},
doi = {10.57233/ijamer.v2i1.30}
}
EUVIMED