PRODUKTIVITAS TENAGA KERJA PROYEK THE DEVELOPMENT AND UPGRADING OF THE STATE UNIVERSITY OF JAKARTA (PHASE 2) CIVIL WORKS (Studi Kasus Pekerjaan Pemasangan Dinding Bata Ringan)

Muhammad Zidane Imadudine, Muhamad Rasyid Wahyu Saputra, Yudha Pracastino Heston, Rizky Citra Islami

Jurnal Inovasi Konstruksi · 2025

DOI: 10.56911/jik.v4i1.46 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Jurnal Inovasi Konstruksi, 2025. Verfasst von Muhammad Zidane Imadudine und 3 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The Development and Upgrading of the State University of Jakarta (Phase 2) Civil Works Project involves the construction of five towers: A, B, C, D, and CDCE. Efficient resource utilization, particularly labor productivity, is critical for project success. This study aims to determine the labor productivity coefficient in the installation of lightweight brick walls on the project. A quantitative method was used, with data collected through direct observation and activity recording. The results were compared to the standard values in PUPR Regulation No. 1 of 2022. The observed labor productivity coefficients were 0.014 OH for workers, 0.029 OH for masons, and 0.015 OH for foremen — substantially lower than the normative values of 0.671 OH, 0.13 OH, and 0.003 OH, respectively. In terms of output, the average productivity rates reached 71.428 m²/day for workers, 34.482 m²/day for masons, and 69.04 m²/day for foremen. These exceed the normative standards of 1.49 m²/day, 7.69 m²/day, and 333.33 m²/day, respectively. The findings suggest that actual productivity surpasses regulatory benchmarks. Further research is recommended to explore factors influencing this performance.

Zitieren

APA

Imadudine, M. Z., Saputra, M. R. W., Heston, Y. P., & Islami, R. C. (2025). PRODUKTIVITAS TENAGA KERJA PROYEK THE DEVELOPMENT AND UPGRADING OF THE STATE UNIVERSITY OF JAKARTA (PHASE 2) CIVIL WORKS (Studi Kasus Pekerjaan Pemasangan Dinding Bata Ringan). Jurnal Inovasi Konstruksi. https://doi.org/10.56911/jik.v4i1.46

Vancouver

Imadudine MZ, Saputra MRW, Heston YP, Islami RC. PRODUKTIVITAS TENAGA KERJA PROYEK THE DEVELOPMENT AND UPGRADING OF THE STATE UNIVERSITY OF JAKARTA (PHASE 2) CIVIL WORKS (Studi Kasus Pekerjaan Pemasangan Dinding Bata Ringan). Jurnal Inovasi Konstruksi. 2025. doi:10.56911/jik.v4i1.46

BibTeX
@article{Imadudine2025,
  author = {Imadudine, Muhammad Zidane and Saputra, Muhamad Rasyid Wahyu and Heston, Yudha Pracastino and Islami, Rizky Citra},
  title = {PRODUKTIVITAS TENAGA KERJA PROYEK THE DEVELOPMENT AND UPGRADING OF THE STATE UNIVERSITY OF JAKARTA (PHASE 2) CIVIL WORKS (Studi Kasus Pekerjaan Pemasangan Dinding Bata Ringan)},
  journal = {Jurnal Inovasi Konstruksi},
  year = {2025},
  doi = {10.56911/jik.v4i1.46}
}
Kostenlos starten →