Perbandingan Metode Bekisting Kolom Sistem Semi dan Sistem MESA pada Proyek Gedung di Kota Semarang
Jurnal Inovasi Konstruksi · 2023
DOI: 10.56911/jik.v2i1.33 ↗Kurz gefasst
Fachartikel in der Zeitschrift Jurnal Inovasi Konstruksi, 2023. Verfasst von Zhaafira Naresditya Kanaya Setiyawan und 3 weiteren Autor:innen.
Abstract (Originalsprache)
This study compares the time and cost of the semi-system column formwork method and MESA system in one of the building construction projects in Semarang. The observation used the time study method for productivity calculations and the work sampling method for the calculation of the Labour Utilization Rate. The data was then processed and produced productivity of 35.887 m 2 / hour with a LUR of 75.6% for the semi-system method and 49.825 m 2 / hour with a LUR value of 75.2% for the MESA system. The coefficient of helper is 0.008 OH, foreman is 0.004 OH, and operator is 0.004 OH for the semi-system method. The coefficient of helper is 0.006 OH, foreman is 0.003 OH, and operator is 0.003OH for the MESA system. The results of the cost of installing and disassembling 1 m 2 of semi-system formwork work amounted to Rp. 232,334.00 and Rp. 718,479.00 for the MESA system.
Zitieren
APA
Setiyawan, Z. N. K., Hussein, M. A. A., Utama, A. B., & Fernando, R. (2023). Perbandingan Metode Bekisting Kolom Sistem Semi dan Sistem MESA pada Proyek Gedung di Kota Semarang. Jurnal Inovasi Konstruksi. https://doi.org/10.56911/jik.v2i1.33
Vancouver
Setiyawan ZNK, Hussein MAA, Utama AB, Fernando R. Perbandingan Metode Bekisting Kolom Sistem Semi dan Sistem MESA pada Proyek Gedung di Kota Semarang. Jurnal Inovasi Konstruksi. 2023. doi:10.56911/jik.v2i1.33
BibTeX
@article{Setiyawan2023,
author = {Setiyawan, Zhaafira Naresditya Kanaya and Hussein, Muhammad Adam Al and Utama, Agung Bhakti and Fernando, Robi},
title = {Perbandingan Metode Bekisting Kolom Sistem Semi dan Sistem MESA pada Proyek Gedung di Kota Semarang},
journal = {Jurnal Inovasi Konstruksi},
year = {2023},
doi = {10.56911/jik.v2i1.33}
}
EUVIMED