Fachartikel in der Zeitschrift Journal of Naval Sciences and Engineering, 2024. Verfasst von Fatih Çelik und 1 weiteren Autor:innen. Die Arbeit nennt 25 Literaturangaben.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

In this paper, we consider a problem inspired by a real-life problem, which aims to schedule high multiplicity jobs on a single machine by taking into account the organization-specific constraints in a different schedule structure. The schedule is daily with daytime and nighttime periods. The operator is considered as an additional resource that varies in terms of consumption and scheduling depending on the period. There are specific rest periods before and after night-period jobs, and night-period jobs affect both the daily working time and number of the jobs in the daytime- period. In addition, the operator's daily workload is divided into two categories: normal and heavy. If the workload is heavy on consecutive days, specific rest periods must be scheduled. The integer programming model of the problem is presented. The feasible solutions obtained in a short time with greedy constructive heuristic algorithms are used in the exact solution approach as both upper bound and warm-start point. Finally, the effectiveness of the solution approaches is compared and evaluated through numerical experiments carried out for a variety of problem instances of different sizes.

Zitieren

APA

Çelik, F., & Güner, E. (2024). A WORKLOAD DEPENDENT RESOURCE CONSTRAINED SCHEDULING PROBLEM FOR NAVY HELICOPTER PILOTS. Journal of Naval Sciences and Engineering. https://doi.org/10.56850/jnse.1465463

Vancouver

Çelik F, Güner E. A WORKLOAD DEPENDENT RESOURCE CONSTRAINED SCHEDULING PROBLEM FOR NAVY HELICOPTER PILOTS. Journal of Naval Sciences and Engineering. 2024. doi:10.56850/jnse.1465463

BibTeX
@article{elik2024,
  author = {Çelik, Fatih and Güner, Ertan},
  title = {A WORKLOAD DEPENDENT RESOURCE CONSTRAINED SCHEDULING PROBLEM FOR NAVY HELICOPTER PILOTS},
  journal = {Journal of Naval Sciences and Engineering},
  year = {2024},
  doi = {10.56850/jnse.1465463}
}
Kostenlos starten →