Integrated Cost-Schedule-Procurement Risk Index: A Framework and Validation Protocol for Hyper-Scale Data-Center Construction
International Journal of Sustainability and Innovation in Engineering · 18.11.2026 · 4 (1) · 369-384
DOI: 10.56830/ijsie202619 ↗Kurz gefasst
Studienprotokoll in der Zeitschrift International Journal of Sustainability and Innovation in Engineering, online erschienen am 18.11.2026. Verfasst von Ravi Charan Kattula. Die Arbeit nennt 18 Literaturangaben.
Abstract (Originalsprache)
Hyperscale data-center projects combine high capital cost, compressed schedules, specialized long-lead equipment, and global supply chains. Conventional project controls review cost, schedule, procurement, and operational measures separately, so deterioration that starts upstream, for example in procurement, may appear in the Cost Performance Index (CPI) and Schedule Performance Index (SPI) only after it has become costly to recover. This paper proposes the Integrated Cost-Schedule-Procurement Risk Index (ICSP-RI), a composite early-warning index for hyperscale data-center construction, together with a protocol for developing and validating it. The framework starts from 42 candidate indicators in four categories (cost, schedule, procurement, and operational), which are screened, normalized to a common 0–1 risk scale, weighted, and aggregated into a project-level score. The paper specifies the normalization and aggregation formulas, the procedure for estimating weights, provisional risk classes, and a validation design that compares the index with CPI and SPI alone and with a baseline model that combines CPI, SPI, and the procurement variables. Because real project records could not be used, the protocol is demonstrated on synthetic data from a simulation of 40 projects over 24 monthly periods in three scenarios. The demonstration shows that the pipeline runs end to end and behaves sensibly: the index is more accurate than earned-value indicators alone when procurement or operational signals carry information, and shows no gain when they do not. However, the composite performs about as well as using all retained indicators without aggregation, and in the scenario where procurement and execution stress both drive outcomes, it did not meet the pre-specified criterion of improving on a baseline that combines earned-value and procurement indicators. No results from real projects are reported, and the simulation results follow from its stated assumptions.
Zitieren
APA
Kattula, R. C. (2026). Integrated Cost-Schedule-Procurement Risk Index: A Framework and Validation Protocol for Hyper-Scale Data-Center Construction. International Journal of Sustainability and Innovation in Engineering, 4(1), 369-384. https://doi.org/10.56830/ijsie202619
Vancouver
Kattula RC. Integrated Cost-Schedule-Procurement Risk Index: A Framework and Validation Protocol for Hyper-Scale Data-Center Construction. International Journal of Sustainability and Innovation in Engineering. 2026;4(1):369-384. doi:10.56830/ijsie202619
BibTeX
@article{Kattula2026,
author = {Kattula, Ravi Charan},
title = {Integrated Cost-Schedule-Procurement Risk Index: A Framework and Validation Protocol for Hyper-Scale Data-Center Construction},
journal = {International Journal of Sustainability and Innovation in Engineering},
year = {2026},
volume = {4},
number = {1},
pages = {369--384},
doi = {10.56830/ijsie202619}
}
EUVIMED