Abstract (Originalsprache)
In renewable energy projects, the transition to energization and operation of the substation interface must be managed and documented through a coordinated engineering record, commissioning evidence, and formal approval. This paper offers a standardized framework for these records in the turnover package and their application, without replacing utility-specific requirements. The framework is compiled from published interconnection research and select official technical sources, such as Lawrence Berkeley National Laboratory’s Queued Up: 2026 Edition, which projects roughly 8,200 Transmission Interconnection Requests for projects in the U.S. at the end of 2026, including 1,312 GW of generation and approximately 749 GW of storage. The schema consists of 10 modules, 42 core record classes, four readiness gates, and metadata linking each record to the governing source or clause, revision, applicability, owner, evidence location, and approving status of the deliverables. It is important to explicitly record the document edition and project context, as illustrated in the example PJM source document and in ISO projects 1, New England, ERCOT, AEP, IEEE, and NERC. This framework is a design proposal, not an empirical study. No claims are made about prevalence, inter-coder agreement, validation coverage, or reducing rejection or improving the schedule for the requirement. The paper suggests evaluation based on the final project product, first pass, re-submissions, deficiencies, and review time. Project teams need to check the applicability of the governing documents before implementation.
Zitieren
APA
Bajpai, V. (2026). Substation Interface Readiness for Renewable Energy Projects Through a Proposed Standardized Turnover Package Framework. International Journal of Sustainability and Innovation in Engineering, 4(1), 259-275. https://doi.org/10.56830/ijsie202614
Vancouver
Bajpai V. Substation Interface Readiness for Renewable Energy Projects Through a Proposed Standardized Turnover Package Framework. International Journal of Sustainability and Innovation in Engineering. 2026;4(1):259-275. doi:10.56830/ijsie202614
BibTeX
@article{Bajpai2026,
author = {Bajpai, Vidushi},
title = {Substation Interface Readiness for Renewable Energy Projects Through a Proposed Standardized Turnover Package Framework},
journal = {International Journal of Sustainability and Innovation in Engineering},
year = {2026},
volume = {4},
number = {1},
pages = {259--275},
doi = {10.56830/ijsie202614}
}
EUVIMED