EUVIMEDEUVIMED entdecken
Open Access · CC BY-NC-SA 4.0

Prioritizing Production Efficiency Factors in the Crumb Rubber Industry Using Fuzzy PROMETHEE: A Case Study at PT Pantja Surya

Nursakila Ena Anjani, Rima Aprilia

Journal of Computers and Digital Business · 16.08.2026 · 5 (3) · 258-268

DOI: 10.56427/jcbd.v5i3.1067 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Journal of Computers and Digital Business, online erschienen am 16.08.2026. Verfasst von Nursakila Ena Anjani und 1 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-NC-SA 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Production efficiency directly affects a manufacturing company's productivity and competitiveness, yet prioritizing the factors that drive it is complicated by uncertainty and subjectivity in decision-makers' judgments. Fuzzy PROMETHEE has been applied to supplier selection, education, and renewable-energy decisions, but not to ranking production efficiency factors in the crumb rubber industry. This study addresses that gap by prioritizing nine production efficiency factors at PT Pantja Surya, a crumb rubber processor in Simalungun Regency, Indonesia. Fifty-three production employees rated four evaluation criteria and nine factors using linguistic variables, which were converted into Triangular Fuzzy Numbers and defuzzified by the Center of Area method. Pairwise preferences and Leaving, Entering, and Net Flow values were then computed following the PROMETHEE procedure. Raw material availability (A9, Net Flow = 0.938) ranked highest, followed by energy consumption (A6, 0.344), production downtime (A7, 0.250), and labor performance (A4, 0.125); production time efficiency (A1, -0.750) ranked lowest. The ranking offers management a structured basis for prioritizing raw material supply, energy use, and downtime reduction, although it rests on respondents' subjective judgments and should be treated as a decision aid rather than an objective measurement.

Zitieren

APA

Anjani, N. E., & Aprilia, R. (2026). Prioritizing Production Efficiency Factors in the Crumb Rubber Industry Using Fuzzy PROMETHEE: A Case Study at PT Pantja Surya. Journal of Computers and Digital Business, 5(3), 258-268. https://doi.org/10.56427/jcbd.v5i3.1067

Vancouver

Anjani NE, Aprilia R. Prioritizing Production Efficiency Factors in the Crumb Rubber Industry Using Fuzzy PROMETHEE: A Case Study at PT Pantja Surya. Journal of Computers and Digital Business. 2026;5(3):258-268. doi:10.56427/jcbd.v5i3.1067

BibTeX
@article{Anjani2026,
  author = {Anjani, Nursakila Ena and Aprilia, Rima},
  title = {Prioritizing Production Efficiency Factors in the Crumb Rubber Industry Using Fuzzy PROMETHEE: A Case Study at PT Pantja Surya},
  journal = {Journal of Computers and Digital Business},
  year = {2026},
  volume = {5},
  number = {3},
  pages = {258--268},
  doi = {10.56427/jcbd.v5i3.1067}
}
Kostenlos starten →