EUVIMEDEUVIMED entdecken
Crossref

Clifton Suspension Bridge: managing risk through combined structural and geotechnical assessment

Mike Summers, Sam Wood, John Rees, Aogan Mulcahy, Robert MacKean

The Structural Engineer · 01.06.2026 · 6 (104) · 18

DOI: 10.56330/crsu5045 ↗

Kurz gefasst

Fachartikel in der Zeitschrift The Structural Engineer, online erschienen am 01.06.2026. Verfasst von Mike Summers und 4 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

This article briefly summarises the structural and geotechnical assessments undertaken on the Clifton Suspension Bridge and describes how an integrated approach has been used to manage maintenance of the bridge, foundations and slopes.

Zitieren

APA

Summers, M., Wood, S., Rees, J., Mulcahy, A., & MacKean, R. (2026). Clifton Suspension Bridge: managing risk through combined structural and geotechnical assessment. The Structural Engineer, 6(104), 18. https://doi.org/10.56330/crsu5045

Vancouver

Summers M, Wood S, Rees J, Mulcahy A, MacKean R. Clifton Suspension Bridge: managing risk through combined structural and geotechnical assessment. The Structural Engineer. 2026;6(104):18. doi:10.56330/crsu5045

BibTeX
@article{Summers2026,
  author = {Summers, Mike and Wood, Sam and Rees, John and Mulcahy, Aogan and MacKean, Robert},
  title = {Clifton Suspension Bridge: managing risk through combined structural and geotechnical assessment},
  journal = {The Structural Engineer},
  year = {2026},
  volume = {6},
  number = {104},
  pages = {18},
  doi = {10.56330/crsu5045}
}
Kostenlos starten →