EUVIMEDEUVIMED entdecken
Open Access · CC BY-NC-ND 4.0

COAL MINE DRAIGANE SYSTEM TECHNICAL PLANNING AT PT. NAN RIANG, BATANGHARI REGENCY, JAMBI PROVINCE

Glory Hutagalung, Yulius G. Pangkung

INTAN Jurnal Penelitian Tambang · 2022

DOI: 10.56139/intan.v1i1.5 ↗

Kurz gefasst

Fachartikel in der Zeitschrift INTAN Jurnal Penelitian Tambang, 2022. Verfasst von Glory Hutagalung und 1 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-NC-ND 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

PT. Nan Riang is a coal mining company located in Muara Tembesi District, Batanghari Regency, Jambi Province. PT. Nan Riang applied an open pit system in its operation, in which Stripe Mine was considerably implemented as the main method. The utilization of this method would form pits, so that, during rainy days, the water could potentially be stagnant in front. The catchment areas are divided into 6 sections; the 1st catchment area was 0.00929 km2, the 2nd catchment area was 0.06017 km2, the 3rd catchment area was 0.03256 km2, the 4th catchment area was 0.03960 km2, the 5th catchment area was 0.08065 km2, and the 6th catchment area was 0.02596 km2. From the calculation of drainage dimensions, it was highlighted that the water level was approximately 0.26 m, the width of drainage was about 0.39 m, the width of drainage surface was 0.78 m, the wet circumference was about 0.73 m, the depth of was 1.07 m, and length of side was 1.19 m. The pump that is set for the drainage was LCC-H 50-230, with a pumping capacity of 3,405 m3/ hour. These pumps have a Total Head of 90 m, with an impeller rotation of 3710 rpm. The amount of water entering the settling pond was 15.80336 m3/ second, with a settling width of 29.71 m2 pond. Regarding the dimensions of the settling pond, in which water could be gathered as calculated, therefore settling pond should be set at 10 m in length, 4 m in width, and 2 m in height, with a volume of 237.64451 m3.

Zitieren

APA

Hutagalung, G., & Pangkung, Y. G. (2022). COAL MINE DRAIGANE SYSTEM TECHNICAL PLANNING AT PT. NAN RIANG, BATANGHARI REGENCY, JAMBI PROVINCE. INTAN Jurnal Penelitian Tambang. https://doi.org/10.56139/intan.v1i1.5

Vancouver

Hutagalung G, Pangkung YG. COAL MINE DRAIGANE SYSTEM TECHNICAL PLANNING AT PT. NAN RIANG, BATANGHARI REGENCY, JAMBI PROVINCE. INTAN Jurnal Penelitian Tambang. 2022. doi:10.56139/intan.v1i1.5

BibTeX
@article{Hutagalung2022,
  author = {Hutagalung, Glory and Pangkung, Yulius G.},
  title = {COAL MINE DRAIGANE SYSTEM TECHNICAL PLANNING AT PT. NAN RIANG, BATANGHARI REGENCY, JAMBI PROVINCE},
  journal = {INTAN Jurnal Penelitian Tambang},
  year = {2022},
  doi = {10.56139/intan.v1i1.5}
}
Kostenlos starten →