Project Time Scheduling Analysis Using the Critical Path Method and Program Evaluation and Review Techniques on the Sapphire Shophouse Project – Cimanggis Golf Estate
Jurnal Teknik dan Science · 28.02.2026 · 5 (1) · 98-109
DOI: 10.56127/jts.v5i1.2655 ↗Kurz gefasst
Fachartikel in der Zeitschrift Jurnal Teknik dan Science, online erschienen am 28.02.2026. Verfasst von Al Faqih Azzhami Kusworo und 1 weiteren Autor:innen.
Abstract (Originalsprache)
The construction project of Ruko Sapphire – Cimanggis Golf Estate experienced several delays, resulting in discrepancies between the planned schedule outlined in the S-Curve and the actual conditions in the field. These delays were caused by technical issues with the reinforcement fabrication machine, inconsistencies between structural and architectural stair drawings, rescheduling of concrete casting due to weather and the availability of a concrete pump truck. This study aims to analyze the project scheduling using two methods: the Critical Path Method (CPM), to identify the critical path and determine the minimum project duration, and the Program Evaluation and Review Technique (PERT), to estimate optimistic, most likely, and pessimistic time durations as well as the probability of completing the project on schedule. The research was conducted using a descriptive quantitative approach with primary data (observations and interviews) and secondary data (S-Curve). The results show that both CPM and PERT provide consistent, realistic, and accurate duration estimates, helping contractors identify critical activities, reduce the risk of delays, and provide a more reliable basis for project time planning.
Zitieren
APA
Kusworo, A. F. A., & Saputra, R. A. (2026). Project Time Scheduling Analysis Using the Critical Path Method and Program Evaluation and Review Techniques on the Sapphire Shophouse Project – Cimanggis Golf Estate. Jurnal Teknik dan Science, 5(1), 98-109. https://doi.org/10.56127/jts.v5i1.2655
Vancouver
Kusworo AFA, Saputra RA. Project Time Scheduling Analysis Using the Critical Path Method and Program Evaluation and Review Techniques on the Sapphire Shophouse Project – Cimanggis Golf Estate. Jurnal Teknik dan Science. 2026;5(1):98-109. doi:10.56127/jts.v5i1.2655
BibTeX
@article{Kusworo2026,
author = {Kusworo, Al Faqih Azzhami and Saputra, Rifaldi Adi},
title = {Project Time Scheduling Analysis Using the Critical Path Method and Program Evaluation and Review Techniques on the Sapphire Shophouse Project – Cimanggis Golf Estate},
journal = {Jurnal Teknik dan Science},
year = {2026},
volume = {5},
number = {1},
pages = {98--109},
doi = {10.56127/jts.v5i1.2655}
}