The first implementation in Poland of an arch span assembly using SPMT self-propelled platforms
Inżynieria i Budownictwo · 15.05.2026 · LXXXII (3) · 299-303
DOI: 10.5604/01.3001.0055.7416 ↗Kurz gefasst
Fachartikel in der Zeitschrift Inżynieria i Budownictwo, erschienen am 15.05.2026. Verfasst von Jolanta Borucka-Lipska und 1 weiteren Autor:innen.
Abstract (Originalsprache)
This article describes the installation of an arch bridge span over the Dziwna river Canal on the S3 Troszyn–Świnoujście expressway, using SPMT Self Propelled Modular Transporters. The report outlines the characteristics of the structure, the preparatory work involved in moving the span from one bank to the other, and the installation process itself. We presented the characteristics of the structure, the preparatory work involved in moving the span from one side Dziwna River Canal to the other, and the installation work itself. The installation sliding began on mobile platforms, and in the water section using a suitably ballasted and reinforced MAT2000 pontoon. The use of this innovative solution greatly reduced the installation time.
Zitieren
APA
Borucka-Lipska, J., & Majchrzak, D. (2026). The first implementation in Poland of an arch span assembly using SPMT self-propelled platforms. Inżynieria i Budownictwo, LXXXII(3), 299-303. https://doi.org/10.5604/01.3001.0055.7416
Vancouver
Borucka-Lipska J, Majchrzak D. The first implementation in Poland of an arch span assembly using SPMT self-propelled platforms. Inżynieria i Budownictwo. 2026;LXXXII(3):299-303. doi:10.5604/01.3001.0055.7416
BibTeX
@article{BoruckaLipska2026,
author = {Borucka-Lipska, Jolanta and Majchrzak, Daniel},
title = {The first implementation in Poland of an arch span assembly using SPMT self-propelled platforms},
journal = {Inżynieria i Budownictwo},
year = {2026},
volume = {LXXXII},
number = {3},
pages = {299--303},
doi = {10.5604/01.3001.0055.7416}
}
EUVIMED