This paper presents a case study considering the temporary protection of the historic St. John’s Bridge in Lądek Zdrój following the damage caused by the flood wave in September 2024. During a detailed inspection, it was determined that until the renovation is carried out, it is essential to protect the structure against atmospheric precipitation, which could lead to further degradation of the structure. Consequently, several concepts for temporary roofing were considered. Key selection criteria included minimal interference with the historic structure, the durability of the roofing, and the feasibility of rapid implementation. The final concept was established, and its implementation was discussed. The article presents conclusions and a proposal for preliminary guidelines regarding such protective measures, which constitute an original contribution to this work.
Zitieren
APA
Jakiel, P., & Seewald, K. (2026). Temporary protection of flood-damaged historic bridges – a case study. Inżynieria i Budownictwo, LXXXII(2), 170-176. https://doi.org/10.5604/01.3001.0055.7198
Vancouver
Jakiel P, Seewald K. Temporary protection of flood-damaged historic bridges – a case study. Inżynieria i Budownictwo. 2026;LXXXII(2):170-176. doi:10.5604/01.3001.0055.7198
BibTeX
@article{Jakiel2026,
author = {Jakiel, Przemysław and Seewald, Krzysztof},
title = {Temporary protection of flood-damaged historic bridges – a case study},
journal = {Inżynieria i Budownictwo},
year = {2026},
volume = {LXXXII},
number = {2},
pages = {170--176},
doi = {10.5604/01.3001.0055.7198}
}