Analysis of OHS Risk Management and Risk Impact on Project Implementation Time Using the Risk Breakdown Structure (RBS) Method in the Construction of the RKB MIN 5 Tulungagung Building

Eko Budi Utomo, Budi Witjaksana, Jaka Purnama

Formosa Journal of Science and Technology · 02.07.2026 · 5 (6) · 1403-1424

DOI: 10.55927/fjst.v5i6.74 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Formosa Journal of Science and Technology, online erschienen am 02.07.2026. Verfasst von Eko Budi Utomo und 2 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The construction of the New Classroom Building (RKB) at MIN 5 Tulungagung has potential Occupational Safety and Health (OSH) risks because it involves construction activities, work equipment, labor, and diverse project environmental conditions. This study aims to identify OSH risk factors, determine risk levels and priorities, and analyze the impact of dominant risks on project implementation time. The results show that there are 20 OSH risk factors classified into environmental, human, equipment, work method, and management/organizational factors. The highest dominant risk is the lack of internal communication and coordination among project parties, with a risk value of 12.240. Other priority risks include extreme weather 11.778, dust exposure due to construction activities 10.444, and lack of worker skills 10.427, which are classified as high risks, while not using personal protective equipment (PPE) 9.747 is classified as a moderate risk. No risks are classified as very high. Based on expert judgement, extreme weather has the greatest estimated delay of 1–7 days, while other risks may cause delays of 1–3 days. Therefore, OSH risk control needs to be implemented systematically to improve work safety, maintain work smoothness, and support timely project implementation

Zitieren

APA

Utomo, E. B., Witjaksana, B., & Purnama, J. (2026). Analysis of OHS Risk Management and Risk Impact on Project Implementation Time Using the Risk Breakdown Structure (RBS) Method in the Construction of the RKB MIN 5 Tulungagung Building. Formosa Journal of Science and Technology, 5(6), 1403-1424. https://doi.org/10.55927/fjst.v5i6.74

Vancouver

Utomo EB, Witjaksana B, Purnama J. Analysis of OHS Risk Management and Risk Impact on Project Implementation Time Using the Risk Breakdown Structure (RBS) Method in the Construction of the RKB MIN 5 Tulungagung Building. Formosa Journal of Science and Technology. 2026;5(6):1403-1424. doi:10.55927/fjst.v5i6.74

BibTeX
@article{Utomo2026,
  author = {Utomo, Eko Budi and Witjaksana, Budi and Purnama, Jaka},
  title = {Analysis of OHS Risk Management and Risk Impact on Project Implementation Time Using the Risk Breakdown Structure (RBS) Method in the Construction of the RKB MIN 5 Tulungagung Building},
  journal = {Formosa Journal of Science and Technology},
  year = {2026},
  volume = {5},
  number = {6},
  pages = {1403--1424},
  doi = {10.55927/fjst.v5i6.74}
}
Kostenlos starten →