Crossref
A Case Study of Automated Simulation for Excavator Cycle Time Estimation
Journal of Construction Automation and Robotics · 2023
DOI: 10.55785/jcar.2.1.13 ↗Kurz gefasst
Fachartikel in der Zeitschrift Journal of Construction Automation and Robotics, 2023. Verfasst von ChungBae Yoon und 1 weiteren Autor:innen. Die Arbeit nennt 31 Literaturangaben.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
Yoon, C., & Han, S. (2023). A Case Study of Automated Simulation for Excavator Cycle Time Estimation. Journal of Construction Automation and Robotics. https://doi.org/10.55785/jcar.2.1.13
Vancouver
Yoon C, Han S. A Case Study of Automated Simulation for Excavator Cycle Time Estimation. Journal of Construction Automation and Robotics. 2023. doi:10.55785/jcar.2.1.13
BibTeX
@article{Yoon2023,
author = {Yoon, ChungBae and Han, SangUk},
title = {A Case Study of Automated Simulation for Excavator Cycle Time Estimation},
journal = {Journal of Construction Automation and Robotics},
year = {2023},
doi = {10.55785/jcar.2.1.13}
}
EUVIMED