EUVIMEDEUVIMED entdecken
Open Access · CC BY-SA 4.0

An Adaptive Risk Management Strategy Model for the Successful Implementation of the Bhayangkara 1-Graha Raya-Pondok Serut-Kayu Gede 1-Kayu Gede 2 Road Improvement Project

Titi Siti Masturoh, Muhammad Isradi, Mawardi Amin

ARMADA : Jurnal Penelitian Multidisiplin · 30.09.2026 · 4 (9) · 5503-5512

DOI: 10.55681/armada.v4i9.3959 ↗

Kurz gefasst

Fachartikel in der Zeitschrift ARMADA : Jurnal Penelitian Multidisiplin, online erschienen am 30.09.2026. Verfasst von Titi Siti Masturoh und 2 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

This study aims to develop an adaptive risk management strategy model to improve the success of the Bhayangkara 1 – Graha Raya – Pondok Serut – Kayu Gede 1 – Kayu Gede 2 Road Improvement Project. The study employs a quantitative approach using a survey method. Data were collected through questionnaires distributed to project personnel and analyzed using Structural Equation Modeling–Partial Least Squares (SEM-PLS) and Importance Performance Map Analysis (IPMA). The variables examined include project environmental conditions, human resources, construction equipment, adaptive risk management strategy, and project success. The findings indicate that project environmental conditions and construction equipment have a positive and significant effect on adaptive risk management strategy, while human resources do not show a significant effect. Furthermore, adaptive risk management strategy has a positive and significant influence on project success, particularly in achieving project objectives related to cost, time, and quality. The study concludes that implementing an adaptive risk management strategy supported by a conducive project environment and adequate construction equipment is essential for enhancing the success of road improvement projects.

Zitieren

APA

Masturoh, T. S., Isradi, M., & Amin, M. (2026). An Adaptive Risk Management Strategy Model for the Successful Implementation of the Bhayangkara 1-Graha Raya-Pondok Serut-Kayu Gede 1-Kayu Gede 2 Road Improvement Project. ARMADA : Jurnal Penelitian Multidisiplin, 4(9), 5503-5512. https://doi.org/10.55681/armada.v4i9.3959

Vancouver

Masturoh TS, Isradi M, Amin M. An Adaptive Risk Management Strategy Model for the Successful Implementation of the Bhayangkara 1-Graha Raya-Pondok Serut-Kayu Gede 1-Kayu Gede 2 Road Improvement Project. ARMADA : Jurnal Penelitian Multidisiplin. 2026;4(9):5503-5512. doi:10.55681/armada.v4i9.3959

BibTeX
@article{Masturoh2026,
  author = {Masturoh, Titi Siti and Isradi, Muhammad and Amin, Mawardi},
  title = {An Adaptive Risk Management Strategy Model for the Successful Implementation of the Bhayangkara 1-Graha Raya-Pondok Serut-Kayu Gede 1-Kayu Gede 2 Road Improvement Project},
  journal = {ARMADA : Jurnal Penelitian Multidisiplin},
  year = {2026},
  volume = {4},
  number = {9},
  pages = {5503--5512},
  doi = {10.55681/armada.v4i9.3959}
}
Kostenlos starten →