Fallstudie av rekonstruerad betongväg på E22 mellan Åkarp och Lund
Department of Technology and Society · 25.03.2026
DOI: 10.55329/xokb4172 ↗Kurz gefasst
Fachartikel in der Zeitschrift Department of Technology and Society, online erschienen am 25.03.2026. Verfasst von Per Tyllgren und 3 weiteren Autor:innen. Die Arbeit nennt 36 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).
Abstract (Originalsprache)
Sweden's first motorway between Malmö and Lund was inaugurated in 1953 and was built of concrete. Deterioration resulted in larger maintenance starting in 1979, when the concrete slabs was cracked with two asphalt layers constructed on top. Originally a wearing course of porous asphalt was selected. However, it turned out problematic and over time it was removed. The asphalt construction of about 11 cm was also shown to be too thin. After investigations around year 2000, it was decided that the Scanian concrete motorways from the 1950s to 1978 was to receive extra funding for more extensive reconstruction. Among the first objects was a continuation of the maintinance started in 1979 on the E22 between Åkarp and Lund, which was finished in 2005. All asphalt was removed down to old concrete in the right lane, while a layer of BG25 from 1979 was left in the left lane, 11.5% of the right lane and 3.3% of the left lane received steel mesh reinforcement. The mesh is on top of a machine leveling with ABb11. With a layer of AG 22 in the right lane, the lanes ended up at the same level. The construction was completed in both lanes with a binder course ABb22 and a wearing course ABS16, the latter with the addition of rhyolite from the province of Dalsland. The total asphalt thickness on top of the cracked concrete was approximately 20 cm. The motorway section has not received any maintenance since the reconstruction in 2005, and the question arose as to why the section appeared to have less degradation than expected given the high traffic volume and the experience from other renovated concrete roads. To investigate the properties and condition of the road, data was collected on materials and measurements carried out: drilled cores and testing of wear resistance against studded tyres of the wearing course, gravel compositions from the road superstructure; mechanical examination of the asphalt layers; strength tests, composition analysis, extraction of components and testing of bitumen and stone quality; ground penetration radar measurements of thickness and location of mesh reinforcement, drop weight measurement, rolling bearing capacity measurement with Raptor and sampling of the superstructure. In addition, data was collected from PMSv4. The reason for the durability of the road since the reconstruction has several possible explanations. The foundation of over 65 cm of natural, uncrushed, stone gravel seems to have ensured sufficient bearing capacity and reduced the risk of frost problems. However, the round stones under the concrete do not seem to have been still, resulting in tilting concrete slabs. The cracking of the reinforced concrete slabs created a compliance with the surrounding layers, which seems to have counteracted reflection cracks. The total thickness of the asphalt layer captures displacements that occur due to changes in moisture and temperature between the seasons and the movements of the traffic loads without ruptures occurring. The bearing capacity measurements generally show high bearing capacity, above the guideline value for a heavily trafficked road like this. The combination of different stone materials created a durable surface structure with sufficient friction, which in combination with constant crossfall and the lack of subsidence counteracts the risk of aquaplaning. There does not appear to be any signs of disintegration or deformation in any of the layers examined. Bitumen 70/100 without polymer modification seems to have resulted in the layers with AG and ABb having a stiffness and ductility that has withstood the loads. The wearing course with a polymermodified bitumen, 70/100-48, contains approximately 2% polymer, which appears to have ensured that the binder has sufficient ductility and adhesion to withstand the traffic loads and the aging effect. Handleability and layability have been achieved at lower manufacturing temperatures than with high polymer contents, counteracting hardening during manufacturing. The road surface shows no visible cracks or material loss. A possible success factor was that the professional workers were spared traffic, resulting in an safer work environment and less load on the pavement during construction. Interviewed asphalt workers remember the materials as being particularly flexible and easy to lay. This is required to achieve good properties and long durability. The result show that manuals and guidelines need to be developed. The conclusion of the studies carried out is that all parameters, from materials to execution, interacted to achieve the quality that the reconstruction from 2005 led to. Whether the results can be repeated on other similar road objects depends on the circumstances and any limitations that each specific work faces.
Zitieren
APA
Tyllgren, P., Agardh, S., Sulejmani, P., & Lundberg, J. (2026). Fallstudie av rekonstruerad betongväg på E22 mellan Åkarp och Lund. Department of Technology and Society. https://doi.org/10.55329/xokb4172
Vancouver
Tyllgren P, Agardh S, Sulejmani P, Lundberg J. Fallstudie av rekonstruerad betongväg på E22 mellan Åkarp och Lund. Department of Technology and Society. 2026. doi:10.55329/xokb4172
BibTeX
@article{Tyllgren2026,
author = {Tyllgren, Per and Agardh, Sven and Sulejmani, Pajtim and Lundberg, Joacim},
title = {Fallstudie av rekonstruerad betongväg på E22 mellan Åkarp och Lund},
journal = {Department of Technology and Society},
year = {2026},
doi = {10.55329/xokb4172}
}
EUVIMED