THE PRICE OF DELAY IN DEFENCE PROCUREMENT: HOW POSTPONED ACQUISITION INCREASES THE COST OF VVO AND DRIVES ADJUSTMENTS IN BUDGET EXECUTION
Economic Development · 15.07.2026 · 28 (2) · 216
DOI: 10.55302/ed26282216b ↗Kurz gefasst
Fachartikel in der Zeitschrift Economic Development, online erschienen am 15.07.2026. Verfasst von Petar Bogojeski. Die Arbeit nennt 18 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).
Abstract (Originalsprache)
This paper develops a theoretical explanation of why postponed or delayed defense procurement systematically increases the final price of VVO (weapons and military equipment). The argument is centred on the proposition that delay is not a neutral administrative deviation but a price forming factor in defence markets. Even when technical specifications remain unchanged, delay activates predictable escalation channels: defence specific inflation and time based price escalation, supplier capacity constraints and risk pricing, currency exposure and contractual indexation, and the costs of process repetition through reauthorisations, retendering and contract amendments. The framework is complemented with a stylised institutional illustration from North Macedonia based on publicly available procurement planning and budget execution practices, showing how delays translate into higher procurement prices and consequently necessitate reallocations and budget adjustments. The paper contributes a structured set of testable propositions and a procurement policy logic relevant for NATO aligned capability requirements, emphasising that controlling procurement time is a direct economic instrument for controlling the price of VVO.
Zitieren
APA
Bogojeski, P. (2026). THE PRICE OF DELAY IN DEFENCE PROCUREMENT: HOW POSTPONED ACQUISITION INCREASES THE COST OF VVO AND DRIVES ADJUSTMENTS IN BUDGET EXECUTION. Economic Development, 28(2), 216. https://doi.org/10.55302/ed26282216b
Vancouver
Bogojeski P. THE PRICE OF DELAY IN DEFENCE PROCUREMENT: HOW POSTPONED ACQUISITION INCREASES THE COST OF VVO AND DRIVES ADJUSTMENTS IN BUDGET EXECUTION. Economic Development. 2026;28(2):216. doi:10.55302/ed26282216b
BibTeX
@article{Bogojeski2026,
author = {Bogojeski, Petar},
title = {THE PRICE OF DELAY IN DEFENCE PROCUREMENT: HOW POSTPONED ACQUISITION INCREASES THE COST OF VVO AND DRIVES ADJUSTMENTS IN BUDGET EXECUTION},
journal = {Economic Development},
year = {2026},
volume = {28},
number = {2},
pages = {216},
doi = {10.55302/ed26282216b}
}
EUVIMED