Lead Time Analysis in Port-To-Plant Material Movement and its Impact on Supply Chain Performance At Chennai Port Authority
International Journal of Creative and Open Research in Engineering and Management · 03.05.2026 · 02 (05) · 1-4
DOI: 10.55041/ijcope.v2i4.1010 ↗Kurz gefasst
Fachartikel in der Zeitschrift International Journal of Creative and Open Research in Engineering and Management, online erschienen am 03.05.2026. Verfasst von Joshua Jayaraj L Joshua Jayaraj L und 1 weiteren Autor:innen.
Abstract (Originalsprache)
Lead time is a critical factor influencing supply chain efficiency, particularly in port-based logistics systems. This study examines lead time variability in port-to-plant material movement and its impact on supply chain performance at Chennai Port Authority. A descriptive research design was adopted using both primary and secondary data. Primary data was collected from 70 respondents, including logistics professionals and port employees, through structured questionnaires. The findings reveal that transportation delays, customs procedures, and infrastructure limitations significantly affect lead time. The study also highlights the role of digital technologies such as automation and real-time tracking in improving efficiency. It concludes that enhancing infrastructure, simplifying processes, and adopting digital solutions can reduce delays and improve supply chain performance. Keywords: Lead Time, Supply Chain, Port Logistics, Transportation Delays, Digital Transformation
Zitieren
APA
L, J. J. L. J. J., & Jyothi, D. P. J. D. P. (2026). Lead Time Analysis in Port-To-Plant Material Movement and its Impact on Supply Chain Performance At Chennai Port Authority. International Journal of Creative and Open Research in Engineering and Management, 02(05), 1-4. https://doi.org/10.55041/ijcope.v2i4.1010
Vancouver
L JJLJJ, Jyothi DPJDP. Lead Time Analysis in Port-To-Plant Material Movement and its Impact on Supply Chain Performance At Chennai Port Authority. International Journal of Creative and Open Research in Engineering and Management. 2026;02(05):1-4. doi:10.55041/ijcope.v2i4.1010
BibTeX
@article{L2026,
author = {L, Joshua Jayaraj L Joshua Jayaraj and Jyothi, Dr. P. Jyothi Dr. P.},
title = {Lead Time Analysis in Port-To-Plant Material Movement and its Impact on Supply Chain Performance At Chennai Port Authority},
journal = {International Journal of Creative and Open Research in Engineering and Management},
year = {2026},
volume = {02},
number = {05},
pages = {1--4},
doi = {10.55041/ijcope.v2i4.1010}
}
EUVIMED