Perencanaan Hidrolis Pintu Pada Bangunan Pengambilan Air (Intake)
Jurnal Rekayasa Konstruksi Mekanika Sipil (JRKMS) · 2018
DOI: 10.54367/jrkms.v1i2.282 ↗Kurz gefasst
Fachartikel in der Zeitschrift Jurnal Rekayasa Konstruksi Mekanika Sipil (JRKMS), 2018. Verfasst von Binsar Silitonga und 1 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-NC-SA 4.0).
Abstract (Originalsprache)
The planning process of an intake water building must be conducted properly, such by considering several aspects namely topography, hydro-climatology, and also hydraulic condition of existing stream. In the planning of intake water building, the dimensions of water gate are based on the existing weir building. The Existing Dam building in this study is Sei Bingei weir. This weir was constructed to detain the flow of Bingei River. The weir is used to collect water to fill the demand of water company (PAM) Tirta Sari Binjai City.
Zitieren
APA
Silitonga, B., & Hendry, H. (2018). Perencanaan Hidrolis Pintu Pada Bangunan Pengambilan Air (Intake). Jurnal Rekayasa Konstruksi Mekanika Sipil (JRKMS). https://doi.org/10.54367/jrkms.v1i2.282
Vancouver
Silitonga B, Hendry H. Perencanaan Hidrolis Pintu Pada Bangunan Pengambilan Air (Intake). Jurnal Rekayasa Konstruksi Mekanika Sipil (JRKMS). 2018. doi:10.54367/jrkms.v1i2.282
BibTeX
@article{Silitonga2018,
author = {Silitonga, Binsar and Hendry, Hendry},
title = {Perencanaan Hidrolis Pintu Pada Bangunan Pengambilan Air (Intake)},
journal = {Jurnal Rekayasa Konstruksi Mekanika Sipil (JRKMS)},
year = {2018},
doi = {10.54367/jrkms.v1i2.282}
}
EUVIMED