DARC-OR: Dual-Signal Adaptive Recalibration and Concept-Drift Response for Capacity-Constrained Operational-Risk Early Warning
International Journal of Advanced Engineering and Technology Research · 2026
DOI: 10.54097/nddhpw10 ↗Kurz gefasst
Fachartikel in der Zeitschrift International Journal of Advanced Engineering and Technology Research, 2026. Verfasst von Ethan Mercer. Der Volltext ist frei zugänglich (Open Access, CC BY-NC 4.0).
Abstract (Originalsprache)
Operational-risk early-warning models in financial institutions operate under nonstationarity, extreme class imbalance, delayed outcome confirmation, and finite investigation capacity. This paper proposes DARC-OR, a drift-response framework that combines an immediately available Jensen-Shannon divergence signal on model scores with a delayed supervised EWMA signal on balanced log loss. The controller distinguishes short-lived distribution change from persistent or performance-relevant change, using recalibration for the former and recency-weighted adaptive-window retraining for the latter. A controlled 120-day transaction stream benchmark was executed for five independent seeds, totaling 720,000 transactions and 6,839 positive events, with abrupt, gradual, and recurring concept changes, a three-day label delay, and a 0.5% daily review capacity. Across the five runs, DARC-OR achieved average precision 0.1719 +/- 0.0280, exceeding a delayed-loss trigger by 21.55% and a static model by 38.22%; recall at capacity was 0.1423 +/- 0.0175 and Brier score was 0.008374 +/- 0.000305. However, its normalized exposure scenario cost (0.7221) was worse than both delayed-loss (0.6888) and static (0.6540) policies, and recurrence exposed substantial forgetting. The results therefore support dual-signal adaptation as a ranking-and-calibration improvement under drift, while showing that drift response, action cost, and recurring-concept memory must remain separately governed.
Zitieren
APA
Mercer, E. (2026). DARC-OR: Dual-Signal Adaptive Recalibration and Concept-Drift Response for Capacity-Constrained Operational-Risk Early Warning. International Journal of Advanced Engineering and Technology Research. https://doi.org/10.54097/nddhpw10
Vancouver
Mercer E. DARC-OR: Dual-Signal Adaptive Recalibration and Concept-Drift Response for Capacity-Constrained Operational-Risk Early Warning. International Journal of Advanced Engineering and Technology Research. 2026. doi:10.54097/nddhpw10
BibTeX
@article{Mercer2026,
author = {Mercer, Ethan},
title = {DARC-OR: Dual-Signal Adaptive Recalibration and Concept-Drift Response for Capacity-Constrained Operational-Risk Early Warning},
journal = {International Journal of Advanced Engineering and Technology Research},
year = {2026},
doi = {10.54097/nddhpw10}
}
EUVIMED