Cross-Stage Coordination Dilemmas in Construction and Demolition Waste Recycling: A Transaction Cost Analysis of Renovation Waste Governance in Shanghai
Frontiers in Business, Economics and Management · 16.11.2026 · 25 (2) · 12-23
DOI: 10.54097/mk31h863 ↗Kurz gefasst
Fachartikel in der Zeitschrift Frontiers in Business, Economics and Management, online erschienen am 16.11.2026. Verfasst von Jinquan Feng. Die Arbeit nennt 25 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY-NC 4.0).
Abstract (Originalsprache)
The recycling of construction and demolition (C&D) waste is not a single end-of-pipe treatment activity but a continuous process consisting of four stages: generation and source disposal; collection, transportation and transfer; resource recovery and recycled material production; and engineering procurement and use. In this paper, cross-stage coordination means that the materials, information and responsibility arrangements formed in an upstream stage satisfy the reception, processing or use requirements of the downstream stage; a cross-stage coordination dilemma arises when adjacent stages each operate yet fail to connect stably because of incompatible requirements in quantity, quality, timing, cost or responsibility. Taking the governance of renovation waste in Shanghai as a case, and drawing on public statistics and survey records covering government disclosures, industry information and regulatory platform information, together with policy documents and related studies, this paper conducts an exploratory, theory-guided qualitative analysis of the coordination problems that persist after sorting management and treatment facilities have been established. The case material reveals three dilemmas: an intake coordination dilemma among generation and disposal, collection and transportation, and centralized treatment; a quality coordination dilemma between source sorting on the one hand and resource recovery and recycled material production on the other; and an application coordination dilemma between recycled material production and engineering procurement and use. Transaction cost theory indicates that the uncertainty of material delivery, the specificity of quality-related investment and the performance requirements of engineering procurement must be matched with arrangements for notification, acceptance, responsibility and cost allocation, and adjustment procedures; insufficient matching may reduce the reliability of handovers, and downstream application constraints may in turn affect upstream intake and treatment. On this basis, the paper proposes a governance path that connects intake allocation, quality responsibility and engineering procurement. The Shanghai case provides an analytical framework for cities in developing countries with similar material and organizational conditions to identify coordination dilemmas and their governance conditions. The proposed mechanisms are case-grounded conditional propositions that still require cross-stage process evidence.
Zitieren
APA
Feng, J. (2026). Cross-Stage Coordination Dilemmas in Construction and Demolition Waste Recycling: A Transaction Cost Analysis of Renovation Waste Governance in Shanghai. Frontiers in Business, Economics and Management, 25(2), 12-23. https://doi.org/10.54097/mk31h863
Vancouver
Feng J. Cross-Stage Coordination Dilemmas in Construction and Demolition Waste Recycling: A Transaction Cost Analysis of Renovation Waste Governance in Shanghai. Frontiers in Business, Economics and Management. 2026;25(2):12-23. doi:10.54097/mk31h863
BibTeX
@article{Feng2026,
author = {Feng, Jinquan},
title = {Cross-Stage Coordination Dilemmas in Construction and Demolition Waste Recycling: A Transaction Cost Analysis of Renovation Waste Governance in Shanghai},
journal = {Frontiers in Business, Economics and Management},
year = {2026},
volume = {25},
number = {2},
pages = {12--23},
doi = {10.54097/mk31h863}
}