Implementation of Assembly and Balancing Line Aiming at Operational Excellence in Pre-Hospital Transport Equipment

Naiara P. V. Sebbe, José C. V. Sá, Maria T. Pereira, Isabel M. Pinto, Andresa Baptista, Ana Júlia Viamonte

Journal of Mechanical Engineering and Manufacturing · 2026

DOI: 10.53941/jmem.2026.100007 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Journal of Mechanical Engineering and Manufacturing, 2026. Verfasst von Naiara P. V. Sebbe und 5 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

In contemporary times, a corporation must provide rapid and faultless production to create differentiated, high-quality items that satisfy market need and standards, also taking into account the available industrial capacities. This study concentrates on optimizing the assembly line for pre-hospital transport equipment and instituting Standard Work across many workstations to enhance production efficiency. Consequently, operational excellence and strategies associated with continuous improvement were considered. Improvements in the assembly line and its edge facilitated a reduction in tasks, enabling a balanced workload among operators and optimizing the manufacturing process. A study was conducted on the durations and techniques employed in the different assembly processes and corresponding workstations for each product family. A comparison was conducted between the data reflecting the company’s baseline state and the outcomes achieved in this project. The implemented adjustments and their influence on the entire production process were assessed.

Zitieren

APA

Sebbe, N. P. V., Sá, J. C. V., Pereira, M. T., Pinto, I. M., Baptista, A., & Viamonte, A. J. (2026). Implementation of Assembly and Balancing Line Aiming at Operational Excellence in Pre-Hospital Transport Equipment. Journal of Mechanical Engineering and Manufacturing. https://doi.org/10.53941/jmem.2026.100007

Vancouver

Sebbe NPV, Sá JCV, Pereira MT, Pinto IM, Baptista A, Viamonte AJ. Implementation of Assembly and Balancing Line Aiming at Operational Excellence in Pre-Hospital Transport Equipment. Journal of Mechanical Engineering and Manufacturing. 2026. doi:10.53941/jmem.2026.100007

BibTeX
@article{Sebbe2026,
  author = {Sebbe, Naiara P. V. and Sá, José C. V. and Pereira, Maria T. and Pinto, Isabel M. and Baptista, Andresa and Viamonte, Ana Júlia},
  title = {Implementation of Assembly and Balancing Line Aiming at Operational Excellence in Pre-Hospital Transport Equipment},
  journal = {Journal of Mechanical Engineering and Manufacturing},
  year = {2026},
  doi = {10.53941/jmem.2026.100007}
}