Effect of Risk Assessment on Performance of Water and Sewerage Projects in Kenya: A Case Study of Nairobi City Water and Sewerage Company
Journal of Strategic Management · 10.11.2026 · 10 (7) · 70-81
DOI: 10.53819/81018102t4439 ↗Kurz gefasst
Fachartikel in der Zeitschrift Journal of Strategic Management, online erschienen am 10.11.2026. Verfasst von Aloise Njeru Njiru und 1 weiteren Autor:innen.
Abstract (Originalsprache)
Today, many infrastructural projects have been characterized by incompleteness, abandonment, and stagnation, with the majority exceeding budget or failing to achieve deliverables. Despite the increasing project management practices adopted, many projects continue to experience challenges in completion. Thus, the purpose of the study was to determine the relationship between risk assessment and performance of water and sewerage projects in Nairobi County, Kenya. A correlational research design was used, whereby data were collected through online questionnaires. The study targeted 210 participants from 45 water and sewerage projects, and participants were selected through stratified random sampling. Using the Yamane formula, the sample was reduced to 138. Data were then analyzed and interpreted using the Statistical Package for the Social Sciences (SPSS) Version 28 for descriptive and inferential analyses. The simple linear regression results indicated that risk assessment was statistically and positively associated with project performance, with a coefficient value of β = 0.55, p < 0.01. The study concludes that risk assessment directly influenced project performance of water and sewerage projects. The study recommends that organizations should strengthen interdisciplinary collaboration among all stakeholders when assessing risks to ensure better project performance. Keywords: Risk Assessment, Risk Category, Likelihood of Risk, Risk Magnitude, Risk Exposure
Zitieren
APA
Njiru, A. N., & Nyaga, J. (2026). Effect of Risk Assessment on Performance of Water and Sewerage Projects in Kenya: A Case Study of Nairobi City Water and Sewerage Company. Journal of Strategic Management, 10(7), 70-81. https://doi.org/10.53819/81018102t4439
Vancouver
Njiru AN, Nyaga J. Effect of Risk Assessment on Performance of Water and Sewerage Projects in Kenya: A Case Study of Nairobi City Water and Sewerage Company. Journal of Strategic Management. 2026;10(7):70-81. doi:10.53819/81018102t4439
BibTeX
@article{Njiru2026,
author = {Njiru, Aloise Njeru and Nyaga, Juster},
title = {Effect of Risk Assessment on Performance of Water and Sewerage Projects in Kenya: A Case Study of Nairobi City Water and Sewerage Company},
journal = {Journal of Strategic Management},
year = {2026},
volume = {10},
number = {7},
pages = {70--81},
doi = {10.53819/81018102t4439}
}
EUVIMED