Abstract (Originalsprache)
The main purpose of this study was to examine the role of stakeholder participation in project performance of funded project in Rwanda. The specific objectives of the study were based on assessing the role of consultative planning, collective implementation and joint monitoring and project performance of AVEH Umurerwa project in Bugesera District of Rwanda. The study target population was 251 people in which 188 respondents were drawn as a sample size of the study in AVEH Umurerwa project in Bugesera District of Rwanda. The researcher used descriptive research design with a mixed approach of qualitiative and quantitative data. Thus, the study used the questionnaires and interview guides to collect data from the field. The stratified random sampling technique was used to ensure that all the stakeholders of the funded project are selected with the equal chance to participate in the study as from each group of the respondents. The results of the first objective revealed that consultative planning plays a significant and a positive role on performance of funded project in Rwanda since the descriptive results shown 1.621 overall mean and the Pearson correlation results confirmed that there is a positive and significant relationship between consultative planning and quality performance(r=0.712 and sig=0.00
Zitieren
APA
Ndayizeye, A., & Munene, P. (2022). Stakeholder Participation and Performance of Funded Project in Rwanda: A Case of Aveh Umurerwa Project in Bugesera District. Journal of Entrepreneurship & Project Management, 6(2), 8-32. https://doi.org/10.53819/81018102t2061
Vancouver
Ndayizeye A, Munene P. Stakeholder Participation and Performance of Funded Project in Rwanda: A Case of Aveh Umurerwa Project in Bugesera District. Journal of Entrepreneurship & Project Management. 2022;6(2):8-32. doi:10.53819/81018102t2061
BibTeX
@article{Ndayizeye2022,
author = {Ndayizeye, Alexis and Munene, Paul},
title = {Stakeholder Participation and Performance of Funded Project in Rwanda: A Case of Aveh Umurerwa Project in Bugesera District},
journal = {Journal of Entrepreneurship & Project Management},
year = {2022},
volume = {6},
number = {2},
pages = {8--32},
doi = {10.53819/81018102t2061}
}
EUVIMED