Abstract (Originalsprache)
This article draws upon the study undertaken with an objective to understand the causes of discrepancies at the design and construction interface in large building projects. To achieve the stated objective, a questionnaire survey was carried out by the authors to collect information on the potential causes of discrepancies. Responses of 48 consultants and contractors were analyzed. Results of which, suggested that, lack of coordination, insufficient working drawings and details, involvement of designer as consultant, involvement of contractor as consultant and participants’ wrong beliefs regarding construction and design are the most important causes of discrepancies at the project design and construction interface. On the other hand, project management as a professional service, nationality of the professional firms and involvement of the contractor in design phases were the least important causes of discrepancies at the project design and construction interface in large building projects. Keywords: Discrepancies, Consultants, Contractors, Building Projects, Saudi Arabia
Zitieren
APA
Arain, F. M., & Assaf, S. A. (2003). PROJECT DESIGN AND CONSTRUCTION INTERFACE DISSONANCES. Journal of Research in Architecture & Planning. https://doi.org/10.53700/jrap0212003_6
Vancouver
Arain FM, Assaf SA. PROJECT DESIGN AND CONSTRUCTION INTERFACE DISSONANCES. Journal of Research in Architecture & Planning. 2003. doi:10.53700/jrap0212003_6
BibTeX
@article{Arain2003,
author = {Arain, Faisal Manzoor and Assaf, Sadi Assaf},
title = {PROJECT DESIGN AND CONSTRUCTION INTERFACE DISSONANCES},
journal = {Journal of Research in Architecture & Planning},
year = {2003},
doi = {10.53700/jrap0212003_6}
}
EUVIMED