A NOVEL BIM-ENABLED SOFTWARE-BASED SOLUTION FOR MITIGATING CONSTRUCTION RISK MANAGEMENT
Yanbu Journal of Engineering and Science · 2025
DOI: 10.53370/001c.120361 ↗Kurz gefasst
Fachartikel in der Zeitschrift Yanbu Journal of Engineering and Science, 2025. Verfasst von Nasser Abosaq und 1 weiteren Autor:innen. Die Arbeit wurde bisher 1-mal zitiert (Crossref) und nennt 16 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).
Abstract (Originalsprache)
This paper presents a novel Software-based solution to mitigate the most prevalent construction risks with systematic implementation of Building Information Modeling Software at the lifecycle stages of the project and provides practical recommendations for industry practitioners. The construction industry has a complex and uncertain process presenting different opportunities and challenges at various project phases. Incorporating traditional risk management methods with BIM helps identify and manage risks effectively. This research paper presents a systematic approach to implementing BIM throughout the lifecycle of an eight-story building project, from feasibility to construction, to manage major risks in each phase. The paper addresses a gap in the literature by identifying and mitigating prominent risks in the construction industry of Pakistan through BIM modeling, based on a review of 180 common risks and detailed interviews. The research methodology involved surveys and data analysis to identify and prioritize the most significant risks and suitable BIM mitigation measures. The study suggests that BIM’s collaboration software resolves communication issues while Clash Detection mitigates Design-related risks before the start of construction. Simulation of Planned vs. Actual Progress and accurate Quantity Estimates achieved by BIM’s estimation software contribute to the successful completion of the project. BIM and its tools have the potential to revolutionize the construction process if used as a structured risk management tool throughout the project lifecycle. The paper advises designing out most project risks in the Planning and Design phase while reserving monitoring and control for later stages as early identification and management of risks is critical for success.
Zitieren
APA
Abosaq, N., & Batool, S. M. (2025). A NOVEL BIM-ENABLED SOFTWARE-BASED SOLUTION FOR MITIGATING CONSTRUCTION RISK MANAGEMENT. Yanbu Journal of Engineering and Science. https://doi.org/10.53370/001c.120361
Vancouver
Abosaq N, Batool SM. A NOVEL BIM-ENABLED SOFTWARE-BASED SOLUTION FOR MITIGATING CONSTRUCTION RISK MANAGEMENT. Yanbu Journal of Engineering and Science. 2025. doi:10.53370/001c.120361
BibTeX
@article{Abosaq2025,
author = {Abosaq, Nasser and Batool, Syeda Manzila},
title = {A NOVEL BIM-ENABLED SOFTWARE-BASED SOLUTION FOR MITIGATING CONSTRUCTION RISK MANAGEMENT},
journal = {Yanbu Journal of Engineering and Science},
year = {2025},
doi = {10.53370/001c.120361}
}
EUVIMED