Evaluation of the Levelized Cost of Energy With New Costs for Concentrating Solar Power Tower Plants in Northern Chile and Impact of Green Taxes
SolarPACES Conference Proceedings · 2023
DOI: 10.52825/solarpaces.v1i.615 ↗Kurz gefasst
Fachartikel in der Zeitschrift SolarPACES Conference Proceedings, 2023. Verfasst von Catalina Hernández und 3 weiteren Autor:innen. Die Arbeit wurde bisher 1-mal zitiert (Crossref) und nennt 16 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Corporación de Fomento de la Producción.
Abstract (Originalsprache)
The world is undergoing an energy transformation, from a system based on fossil fuels to a system based on renewable energy, in order to reach the Paris Agreement target. Chile is no exception, and through the Asociación de Concentración Solar de Potencia (ACSP) has generated a new cost structure for tower-based Concentrated Solar Power (CSP) technology in the framework of the Long-Term Energy Plan, which updates the costs reported in previous studies. The changes experienced in this cost structure make it necessary to study the impact of this cost structure on the levelized cost of energy (LCOE). This work develops simulations of CSP tower plants analyzing their generation and the LCOE based on the new cost structure mentioned, for the north of Chile between the Arica and Parinacota region and the Coquimbo region. The most relevant results show a significant reduction in the LCOE, compared to studies from 2020, reaching a minimum LCOE value of 52,6 USD/MWh. On the other hand, the impact on the net social benefit of including the green tax to the merit order of each of the generating plants that make up the electric park until 2021 is studied, which yields a negative impact under current legislation.
Förderung
- Corporación de Fomento de la Producción
Zitieren
APA
Hernández, C., Cerda, M. T., Felbol, C., & Dinter, F. (2023). Evaluation of the Levelized Cost of Energy With New Costs for Concentrating Solar Power Tower Plants in Northern Chile and Impact of Green Taxes. SolarPACES Conference Proceedings. https://doi.org/10.52825/solarpaces.v1i.615
Vancouver
Hernández C, Cerda MT, Felbol C, Dinter F. Evaluation of the Levelized Cost of Energy With New Costs for Concentrating Solar Power Tower Plants in Northern Chile and Impact of Green Taxes. SolarPACES Conference Proceedings. 2023. doi:10.52825/solarpaces.v1i.615
BibTeX
@article{Hernndez2023,
author = {Hernández, Catalina and Cerda, María Teresa and Felbol, Carlos and Dinter, Frank},
title = {Evaluation of the Levelized Cost of Energy With New Costs for Concentrating Solar Power Tower Plants in Northern Chile and Impact of Green Taxes},
journal = {SolarPACES Conference Proceedings},
year = {2023},
doi = {10.52825/solarpaces.v1i.615}
}
EUVIMED