EUVIMEDEUVIMED entdecken
Crossref

Dynamic flexible job shop scheduling using greedy actor–neural critic PPO reinforcement learning algorithm

Selva Kumar Chandrasekar, Hariss Kumar Shanmugaprabu, Aswath Mani, Nishanth Sami Raja Murugan

Journal of Project Management · 2026 · 11 (3) · 819-840

DOI: 10.5267/j.jpm.2026.4.009 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Journal of Project Management, 2026. Verfasst von Selva Kumar Chandrasekar und 3 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Dynamic Flexible Job Shop Scheduling (DFJSS) is a critical challenge in smart manufacturing due to dynamic job arrivals, machine breakdowns, routing flexibility, and multi-objective performance requirements. Conventional dispatching rules and metaheuristic algorithms often fail to provide adaptive real-time decisions. This paper proposes a Greedy Actor Neural Critic PPO based Reinforcement Learning (GANC-PPO-RL) framework to minimize makespan and total energy consumption. The problem is formulated as a Markov Decision Process, where machine availability, job progress, queue status, processing times, and energy levels define states, and job–machine assignments define actions. A multi-objective reward penalizes higher makespan and energy usage. The PPO algorithm ensures stable policy updates using a clipped objective. Results show makespan within ±2% of benchmarks for small instances and about 23% reduction for larger cases, with 16–20% lower makespan and 15–25% lower energy consumption compared to RL-QL.

Zitieren

APA

Chandrasekar, S. K., Shanmugaprabu, H. K., Mani, A., & Murugan, N. S. R. (2026). Dynamic flexible job shop scheduling using greedy actor–neural critic PPO reinforcement learning algorithm. Journal of Project Management, 11(3), 819-840. https://doi.org/10.5267/j.jpm.2026.4.009

Vancouver

Chandrasekar SK, Shanmugaprabu HK, Mani A, Murugan NSR. Dynamic flexible job shop scheduling using greedy actor–neural critic PPO reinforcement learning algorithm. Journal of Project Management. 2026;11(3):819-840. doi:10.5267/j.jpm.2026.4.009

BibTeX
@article{Chandrasekar2026,
  author = {Chandrasekar, Selva Kumar and Shanmugaprabu, Hariss Kumar and Mani, Aswath and Murugan, Nishanth Sami Raja},
  title = {Dynamic flexible job shop scheduling using greedy actor–neural critic PPO reinforcement learning algorithm},
  journal = {Journal of Project Management},
  year = {2026},
  volume = {11},
  number = {3},
  pages = {819--840},
  doi = {10.5267/j.jpm.2026.4.009}
}
Kostenlos starten →