Dynamic flexible job shop scheduling using greedy actor–neural critic PPO reinforcement learning algorithm
Journal of Project Management · 2026 · 11 (3) · 819-840
DOI: 10.5267/j.jpm.2026.4.009 ↗Kurz gefasst
Fachartikel in der Zeitschrift Journal of Project Management, 2026. Verfasst von Selva Kumar Chandrasekar und 3 weiteren Autor:innen.
Abstract (Originalsprache)
Dynamic Flexible Job Shop Scheduling (DFJSS) is a critical challenge in smart manufacturing due to dynamic job arrivals, machine breakdowns, routing flexibility, and multi-objective performance requirements. Conventional dispatching rules and metaheuristic algorithms often fail to provide adaptive real-time decisions. This paper proposes a Greedy Actor Neural Critic PPO based Reinforcement Learning (GANC-PPO-RL) framework to minimize makespan and total energy consumption. The problem is formulated as a Markov Decision Process, where machine availability, job progress, queue status, processing times, and energy levels define states, and job–machine assignments define actions. A multi-objective reward penalizes higher makespan and energy usage. The PPO algorithm ensures stable policy updates using a clipped objective. Results show makespan within ±2% of benchmarks for small instances and about 23% reduction for larger cases, with 16–20% lower makespan and 15–25% lower energy consumption compared to RL-QL.
Zitieren
APA
Chandrasekar, S. K., Shanmugaprabu, H. K., Mani, A., & Murugan, N. S. R. (2026). Dynamic flexible job shop scheduling using greedy actor–neural critic PPO reinforcement learning algorithm. Journal of Project Management, 11(3), 819-840. https://doi.org/10.5267/j.jpm.2026.4.009
Vancouver
Chandrasekar SK, Shanmugaprabu HK, Mani A, Murugan NSR. Dynamic flexible job shop scheduling using greedy actor–neural critic PPO reinforcement learning algorithm. Journal of Project Management. 2026;11(3):819-840. doi:10.5267/j.jpm.2026.4.009
BibTeX
@article{Chandrasekar2026,
author = {Chandrasekar, Selva Kumar and Shanmugaprabu, Hariss Kumar and Mani, Aswath and Murugan, Nishanth Sami Raja},
title = {Dynamic flexible job shop scheduling using greedy actor–neural critic PPO reinforcement learning algorithm},
journal = {Journal of Project Management},
year = {2026},
volume = {11},
number = {3},
pages = {819--840},
doi = {10.5267/j.jpm.2026.4.009}
}
EUVIMED