EUVIMEDEUVIMED entdecken
Crossref

Managing portfolio’s risk for improving quality in a project oriented manufacture

Farshad Shirazi

International Journal of Innovation in Engineering · 2021

DOI: 10.52547/ijie.1.1.48 ↗

Kurz gefasst

Fachartikel in der Zeitschrift International Journal of Innovation in Engineering, 2021. Verfasst von Farshad Shirazi.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Iran is a developing country and there are many different infrastructure projects in hand. Some of the manufacturers that produce equipment for infrastructure projects as for oil, gas and energy projects should manage their efforts based on production management and project management practices; these kind of manufactures are known as project oriented manufacture. It is very important to manage and control manufacturing equipment project with the consideration of the constraints (time, cost, scope and quality). During the project’s lifecycle many risks take place, either positive or negative that should be controlled not to have a negative effect on quality of the project. With considering this concept, in this paper we will discuss a framework how to manage risks to eliminate negative effects on the quality of the project.

Zitieren

APA

Shirazi, F. (2021). Managing portfolio’s risk for improving quality in a project oriented manufacture. International Journal of Innovation in Engineering. https://doi.org/10.52547/ijie.1.1.48

Vancouver

Shirazi F. Managing portfolio’s risk for improving quality in a project oriented manufacture. International Journal of Innovation in Engineering. 2021. doi:10.52547/ijie.1.1.48

BibTeX
@article{Shirazi2021,
  author = {Shirazi, Farshad},
  title = {Managing portfolio’s risk for improving quality in a project oriented manufacture},
  journal = {International Journal of Innovation in Engineering},
  year = {2021},
  doi = {10.52547/ijie.1.1.48}
}
Kostenlos starten →