Goal Programming Model in Tackling The Optimal Building Material for Production Planning
Journal of Industrial Engineering and Management · 2023
DOI: 10.52088/jaiem.v1i1.2 ↗Kurz gefasst
Fachartikel in der Zeitschrift Journal of Industrial Engineering and Management, 2023. Verfasst von Hendra Cipta und 1 weiteren Autor:innen. Die Arbeit wurde bisher 1-mal zitiert (Crossref). Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).
Abstract (Originalsprache)
The goal achieved in the preparation of production planning is more than one. UD Rezeki Berkah is a small business medium-sized enterprise engaged in the production of building materials. UD Rezeki Berkah aims to meet market demand and must consider the costs used during production to maximize profit. Because of these problems, it will be solved with a goal programming model where this method can solve more than one goal to get a model with optimal goal priority. This research provides an optimal solution, namely achieving the target sales volume and production costs within the Rp limit target. 929,128,971, and profit targets reached Rp. 562,751,890 for a period of one year.
Zitieren
APA
Cipta, H., & Widyasari, R. (2023). Goal Programming Model in Tackling The Optimal Building Material for Production Planning. Journal of Industrial Engineering and Management. https://doi.org/10.52088/jaiem.v1i1.2
Vancouver
Cipta H, Widyasari R. Goal Programming Model in Tackling The Optimal Building Material for Production Planning. Journal of Industrial Engineering and Management. 2023. doi:10.52088/jaiem.v1i1.2
BibTeX
@article{Cipta2023,
author = {Cipta, Hendra and Widyasari, Rina},
title = {Goal Programming Model in Tackling The Optimal Building Material for Production Planning},
journal = {Journal of Industrial Engineering and Management},
year = {2023},
doi = {10.52088/jaiem.v1i1.2}
}
EUVIMED