Production Line Balancing and Cycle Time Optimization in the Motorcycle Manufacturing Industry
International Journal of Engineering, Science and Information Technology · 15.11.2026 · 6 (4) · 394-407
DOI: 10.52088/ijesty.v6i4.1960 ↗Kurz gefasst
Fachartikel in der Zeitschrift International Journal of Engineering, Science and Information Technology, online erschienen am 15.11.2026. Verfasst von Nensi Yuselin und 3 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).
Abstract (Originalsprache)
The manufacturing industry faces increasing pressure to improve productivity and production efficiency due to growing market demand and competition. Unbalanced workloads among workstations can result in excessive cycle times, bottlenecks, idle time, and line stoppages, which negatively affect production performance. These problems are particularly critical in mass-production systems, where consistent cycle time and balanced workload distribution are essential to maintaining stable production flow. This study focuses on a motorcycle manufacturing line producing automatic motorcycles, where several workstations were identified as having cycle times exceeding the established standard. This study aims to improve production line balance by reducing cycle time deviations, redistributing workloads, and increasing overall line efficiency. The study applies a line balancing approach using the Ranked Positional Weight (RPW) method and a heuristic method. Cycle time data were collected from individual workstations and analyzed to identify overloaded and underutilized stations. The improvement process involved redistributing work elements from overloaded workstations to stations with available capacity, supported by layout adjustments and ergonomic considerations. The target cycle time was set at 22 seconds per workstation. The results show that three workstations initially exceeded the 22 second cycle time standard, with cycle times of 24.77 seconds, 23.28 seconds, and 24.43 seconds. After workload redistribution and process improvements, the cycle times of these workstations were reduced to 21.99 seconds, 21.70 seconds, and 21.87 seconds, respectively. The number of workstations was reduced from 22 to 18. Consequently, line efficiency increased from 81,04 % to 95,06 %, while balance delay decreased from approximately 18.96% to 4,94%. These findings demonstrate that integrating RPW, heuristic workload redistribution, and ergonomic layout improvements can effectively enhance production line balance, reduce bottlenecks, and improve production efficiency. The proposed approach provides a practical framework for continuous line balancing in motorcycle manufacturing and other mass-production environments
Zitieren
APA
Yuselin, N., Rosyidi, E., Setiawan, I., & Febriyanti, D. (2026). Production Line Balancing and Cycle Time Optimization in the Motorcycle Manufacturing Industry. International Journal of Engineering, Science and Information Technology, 6(4), 394-407. https://doi.org/10.52088/ijesty.v6i4.1960
Vancouver
Yuselin N, Rosyidi E, Setiawan I, Febriyanti D. Production Line Balancing and Cycle Time Optimization in the Motorcycle Manufacturing Industry. International Journal of Engineering, Science and Information Technology. 2026;6(4):394-407. doi:10.52088/ijesty.v6i4.1960
BibTeX
@article{Yuselin2026,
author = {Yuselin, Nensi and Rosyidi, Edward and Setiawan, Indra and Febriyanti, Dea},
title = {Production Line Balancing and Cycle Time Optimization in the Motorcycle Manufacturing Industry},
journal = {International Journal of Engineering, Science and Information Technology},
year = {2026},
volume = {6},
number = {4},
pages = {394--407},
doi = {10.52088/ijesty.v6i4.1960}
}
EUVIMED