Focusing on Demand Side Management in the Future of the Electric Grid
Pittsburgh Journal of Environmental and Public Health Law · 2010
DOI: 10.5195/pjephl.2010.19 ↗Kurz gefasst
Fachartikel in der Zeitschrift Pittsburgh Journal of Environmental and Public Health Law, 2010. Verfasst von Steven D. Czajkowski. Die Arbeit wurde bisher 1-mal zitiert (Crossref).
Abstract (Originalsprache)
The widespread blackout that occurred on August 14, 2003 (“the blackout”) exposed the weaknesses of the current electric transmission grid structure, and underscored the need for improvements to the transmission grid in the United States. The outage knocked out power to approximately fifty million people in Ohio, Michigan, Pennsylvania, New York, Vermont, Massachusetts, Connecticut, New Jersey and the Canadian province of Ontario. 1 The total cost in the United States was estimated to be between $4 and $10 billion.
Zitieren
APA
Czajkowski, S. D. (2010). Focusing on Demand Side Management in the Future of the Electric Grid. Pittsburgh Journal of Environmental and Public Health Law. https://doi.org/10.5195/pjephl.2010.19
Vancouver
Czajkowski SD. Focusing on Demand Side Management in the Future of the Electric Grid. Pittsburgh Journal of Environmental and Public Health Law. 2010. doi:10.5195/pjephl.2010.19
BibTeX
@article{Czajkowski2010,
author = {Czajkowski, Steven D.},
title = {Focusing on Demand Side Management in the Future of the Electric Grid},
journal = {Pittsburgh Journal of Environmental and Public Health Law},
year = {2010},
doi = {10.5195/pjephl.2010.19}
}
EUVIMED